Necessary Capacity Reserve as a Problem of Plant Operation Scheduling.

被引:0
|
作者
Schaeper, Wolfgang
机构
关键词
SCHEDULING;
D O I
暂无
中图分类号
学科分类号
摘要
A practical method for determining the capacity reserve necessary for operational reasons is presented. This allows the control engineer to calculate, for the respective daily plant operation plan, the minute and hour reserve necessary to ensure a given system reliability. On the basis of an analysis of the operating behavior of the individual generating units as well as of a model of reserve operation following power station failure, the basic steps of the recursive cumulative failure probability method are explained using two realistic mathematical problems. Several factors affecting the reserve are discussed, with special attention to the importance of the reliability level.
引用
收藏
页码:94 / 98
相关论文
共 50 条
  • [31] SOME PROBLEM AREAS IN CLARIFICATION PLANT OPERATION
    MANSFIELD, GH
    EFFLUENT & WATER TREATMENT JOURNAL, 1977, 17 (08): : 413 - &
  • [32] POSCO sinter plant capacity, operation and sinter quality
    Ri, DW
    SEMINAR ON SINTER AND PELLETES 1999, 2000, : 127 - 131
  • [33] DETERMINATION OF OPTIMAL PLANT-CAPACITY FOR A MINING OPERATION
    VICKERS, EL
    CELASUN, M
    OPERATIONS RESEARCH, 1961, 9 : B136 - B136
  • [34] SAFE PLANNING FOR SEMIPLANT OR PILOT PLANT PROJECTS IS NECESSARY FOR SAFE OPERATION
    MACCUTCHEON, SM
    INDUSTRIAL AND ENGINEERING CHEMISTRY, 1956, 48 (05): : A96 - A98
  • [35] The capacity and distance constrained plant location problem
    Albareda-Sambola, Maria
    Fernandez, Elena
    Laporte, Gilbert
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (02) : 597 - 611
  • [36] Heuristics for assembly operation scheduling problem in flexible assembly systems
    Jeong, Bongju
    Sim, Seung-Bae
    Jung, Hosang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 29 (9-10): : 1033 - 1040
  • [37] Heuristics for assembly operation scheduling problem in flexible assembly systems
    Bongju Jeong
    Seung-Bae Sim
    Hosang Jung
    The International Journal of Advanced Manufacturing Technology, 2006, 29 : 1033 - 1040
  • [38] Electric airport ferry vehicle scheduling problem for sustainable operation
    Jin, Zhongyi
    Ng, Kam K. H.
    Wang, Haoqing
    Wang, Shuaian
    Zhang, Chenliang
    JOURNAL OF AIR TRANSPORT MANAGEMENT, 2025, 123
  • [39] Determination of Reserve Capacity under the Regional Interaction Operation with Wind Power Integration
    Liu Rao
    Ba Yu
    Zhang Xin
    Shen Shuo
    Chang Yekui
    Song Yi
    Wang Yan
    Li Weidong
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON LOGISTICS, ENGINEERING, MANAGEMENT AND COMPUTER SCIENCE (LEMCS 2015), 2015, 117 : 375 - 379
  • [40] Microgrid Optimal Operation Considering Virtual Reserve Capacity Trading of Storage Battery
    Zhang Xiaobo
    Zhang Baohui
    He Qifei
    Guan Jun
    2016 IEEE 16TH INTERNATIONAL CONFERENCE ON ENVIRONMENT AND ELECTRICAL ENGINEERING (EEEIC), 2016,