MANPOWER SCHEDULING.

被引:0
|
作者
Browne, James J.
Tibrewala, Rajen K.
机构
来源
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
INDUSTRIAL ENGINEERING
引用
收藏
页码:22 / 23
相关论文
共 50 条
  • [21] Modern Order Organization in Work Scheduling.
    Kluge, Hermann
    Beckendorff, Ulrich
    Anders, Nico
    VDI-Z, 1987, l29 (07): : 42 - 49
  • [22] ROLE OF EVAPOTRANSPIRATION MODELS IN IRRIGATION SCHEDULING.
    Jensen, Marvin E.
    Wright, James L.
    Transactions of the American Society of Agricultural Engineers, 1978, 21 (01): : 82 - 87
  • [23] ON THE COMPLEXITY OF MEAN FLOW TIME SCHEDULING.
    Sethi, Ravi
    Mathematics of Operations Research, 1977, 2 (04) : 320 - 330
  • [24] Cybertraining: Activities and Time Scheduling. A Case Study
    Isoc, Dorin
    Surubaru, Teodora
    IMPACT OF THE 4TH INDUSTRIAL REVOLUTION ON ENGINEERING EDUCATION, ICL2019, VOL 1, 2020, 1134 : 601 - 613
  • [25] LINKING LEVEL REQUIREMENTS IN PRODUCTION PLANNING AND SCHEDULING.
    Burch, E.Earl
    Oliff, Michael D.
    Sumichrast, Robert T.
    Production and inventory management Washington, D.C., 1987, 28 (02): : 123 - 131
  • [26] PRODUCT STRUCTURING CONSIDERATIONS FOR MASTER PRODUCTION SCHEDULING.
    Kneppelt, Leland R.
    Production & Inventory Management, 1984, 25 (01): : 83 - 99
  • [27] DEVELOPMENT AND EVALUATION OF EVAPOTRANSPIRATION MODELS FOR IRRIGATION SCHEDULING.
    Wright, James L.
    Jensen, Marvin E.
    Transactions of the American Society of Agricultural Engineers, 1978, 21 (01): : 88 - 91
  • [28] INTEGER PROGRAMMING APPROACH TO REFERENCE STAFF SCHEDULING.
    Bean, James C.
    Bean, Margaret H.
    1600, (21):
  • [29] Use of combinatorial optimization in core lab scheduling.
    Boyd, IC
    Savory, J
    CLINICAL CHEMISTRY, 1999, 45 (06) : A24 - A24
  • [30] VENDOR CAPACITY PLANNING: AN APPROACH TO VENDOR SCHEDULING.
    Carter, Phillip L.
    Ho, Chrwan-jyh
    Production & Inventory Management, 1984, 25 (04): : 63 - 74