Time-cost Trade-off Relations in Bulk Transportation Problem

被引:0
|
作者
Gupta, A.
Verma, V.
Puri, M. C.
机构
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
下载
收藏
相关论文
共 50 条
  • [21] MINLP optimization model for the nonlinear discrete time-cost trade-off problem
    Klansek, Uros
    Psunder, Mirko
    ADVANCES IN ENGINEERING SOFTWARE, 2012, 48 : 6 - 16
  • [22] Network Analysis Algorithm for the Solution of Discrete Time-Cost Trade-off Problem
    Bettemir, Onder Halis
    Birgonul, M. Talat
    KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (04) : 1047 - 1058
  • [23] TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES
    REDA, R
    CARR, RI
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1989, 115 (03): : 475 - 486
  • [24] Solution of discrete time-cost trade-off problem with adaptive search domain
    Bettemir, Onder Halis
    Birgonul, M. Talat
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023,
  • [25] Efficient modeling of time-cost trade-off problem by eliminating redundant paths
    Ammar, Mohammad A.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (07) : 812 - 821
  • [26] Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash Flows
    Ammar, Mohammad A.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2011, 137 (01): : 65 - 71
  • [27] Multi-project Scheduling: Multicriteria Time-cost Trade-off Problem
    Klevanskiy, N. N.
    Tkachev, S. I.
    Voloshchouk, L. A.
    PROCEEDINGS OF THE 13TH INTERNATIONAL SYMPOSIUM INTELLIGENT SYSTEMS 2018 (INTELS'18), 2019, 150 : 237 - 243
  • [28] Simplified Solution of Time-Cost Trade-off Problem for Building Constructions by Linear Scheduling
    Bettemir, Onder Halis
    Yucel, Tugay
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2023, 17 (02) : 293 - 309
  • [29] Resource Constrained Time-cost Trade-off Problem and its Genetic Algorithm Solution
    Feng, Yixiong
    Lin, Xiaohua
    Tan, Jianrong
    APPLIED MATHEMATICS & INFORMATION SCIENCES, 2013, 7 (02): : 639 - 643
  • [30] A new approach to solve time-cost trade-off problem with fuzzy decision variables
    Ghazanfari, M.
    Yousefli, A.
    Ameli, M. S. Jabal
    Bozorgi-Amiri, A.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (3-4): : 408 - 414