WORKOVER REQUIREMENTS FOR DEEPWATER SUBSEA WELLS.

被引:0
|
作者
Sizer, Phil [1 ]
O'Sullivan, Jim [1 ]
机构
[1] Otis Engineering Corp, Otis Engineering Corp
来源
Ocean industry | 1985年 / 20卷 / 07期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:44 / 47
相关论文
共 50 条
  • [1] CONCENTRIC WORKOVER OPERATIONS IN DEEP SOUR WELLS.
    Fincher, Norton E.
    Audio Engineering Society Preprint, 1979,
  • [2] SIMPLIFIED CONTROL SYSTEM FOR SUBSEA WELLS.
    Milberger, L.J.
    Ocean industry, 1980, 15 (07): : 39 - 42
  • [3] TFL CALIPER FOR USE IN SUBSEA FLOWLINES AND WELLS.
    Pierce, Aaron E.
    Rickey, W.P.
    Dieckman, H.E.
    Society of Petroleum Engineers of AIME, (Paper) SPE, 1980,
  • [4] Gullfaks 'A' subsea wells. Four years' operational experience
    Knudsen, T.W.
    Proceedings - Annual Offshore Technology Conference, 1991,
  • [5] Adaptive Strategy in Execution of Crown Plug Retrieval at the First Deepwater Subsea Workover Campaign
    Sare, Johanes
    Binilang, Ronald
    Pande, Batara
    Herputra, Shanni
    Rossi, Massimo
    Rachmat, Basuki
    Prayogo, Denny
    Melly, Recia Karina
    Offshore Technology Conference Asia, OTCA 2024, 2024,
  • [7] Modular, integrated subsea system selected for deepwater Malampaya wells
    Oil and Gas Journal, 2000, 98 (49): : 69 - 70
  • [8] WORKOVER FLUIDS. PART 3 - USE OF ALCOHOLS AND MUTUAL SOLVENTS IN OIL AND GAS WELLS.
    Hall, B.E.
    World Oil, 1986, 203 (01): : 65 - 66
  • [9] On a stone wells.
    不详
    BULLETIN DE LA SOCIETE PREHISTORIQUE FRANCAISE, 1904, 1 (08): : 269 - 271
  • [10] London wells.
    不详
    NATURE, 1913, 91 : 139 - 139