Nitrification facilities start-up and initial operation

被引:0
|
作者
Bailey, W.F. [1 ]
Bonomo, J.D. [1 ]
Jones, E.R. [1 ]
机构
[1] Wastewater Div., D.C. Dep. Environ. Serv., Washington, DC 20032, United States
来源
| 1600年 / 55期
关键词
WASTEWATER - Treatment - WATER TREATMENT PLANTS;
D O I
暂无
中图分类号
学科分类号
摘要
Washington, DC's Wastewater Treatment Plant has been expanded to include two-state biological nitrification. A systematic approach was used to divide the start-up into several major task groups. The effort involved the planning and implementation of a comprehensive training system, and the inspection of equipment items. Changes in plant performance levels are reflected by changes in operating parameters such as nitrification rates and system stress.
引用
收藏
相关论文
共 50 条
  • [1] NITRIFICATION FACILITIES START-UP AND INITIAL OPERATION
    BAILEY, WF
    BONOMO, JD
    JONES, ER
    JOURNAL WATER POLLUTION CONTROL FEDERATION, 1983, 55 (03): : 221 - 228
  • [2] START-UP AND OPERATION OF 2 LADLE METALLURGY FACILITIES
    PETOZZI, JJ
    72ND STEELMAKING CONFERENCE PROCEEDINGS, 1989, 72 : 185 - 190
  • [3] Start-Up and Steady Operation of Shortcut Nitrification System to Treat Wastewater
    Xu, Li
    Wu, Xue
    Niu, Mingfen
    Li, Si
    Jiao, Hongjing
    Wei, Jian
    PROGRESS IN ENVIRONMENTAL SCIENCE AND ENGINEERING, PTS 1-4, 2013, 610-613 : 1760 - 1763
  • [4] Operation start-up
    Calvaruso, JT
    HOSPITALS & HEALTH NETWORKS, 1997, 71 (23): : 34 - 35
  • [5] The influence of controlling factors on the start-up and operation for partial nitrification in membrane bioreactor
    Xue, Yuan
    Yang, Fenglin
    Liu, Sitong
    Fu, Zhimin
    BIORESOURCE TECHNOLOGY, 2009, 100 (03) : 1055 - 1060
  • [6] CONTAMINATION PREVENTION OF SUPERHEATERS AND REHEATERS DURING INITIAL START-UP AND OPERATION
    GABRIELLI, F
    SYLVESTER, WR
    THIMOT, GW
    COMBUSTION, 1976, 48 (01): : 15 - 16
  • [7] Start-up and operation characteristics of aerobic granular short-cut nitrification process
    Yang, Yang
    Zuo, Jian-E
    Bu, De-Hua
    Gu, Xia-Sheng
    Huanjing Kexue/Environmental Science, 2007, 28 (11): : 2462 - 2466
  • [8] Start-up analysis of partial nitrification process in SBR reactors for different initial conditions
    Iliaszewicz, Paula
    Miodonski, Stanislaw
    9TH CONFERENCE ON INTERDISCIPLINARY PROBLEMS IN ENVIRONMENTAL PROTECTION AND ENGINEERING (EKO-DOK 2017), 2017, 17
  • [9] Start-up of Nitrification Reactor with Various Biomass Concentration
    Pacek, Lukas
    Svehla, Pavel
    Tomaskova, Zuzana
    Radechovsky, Josef
    Balik, Jiri
    SBORNIK Z 18 MEZINARODNI KONFERENCE ON RACIONALNI POUZITI HNOJIV, 2012, : 146 - 151
  • [10] START-UP AND OPERATION OF A FLUOSOLIDS CALCINER
    POTKINS, W
    PULP AND PAPER MAGAZINE OF CANADA, 1970, 71 (21): : 53 - &