共 50 条
- [2] Partial nitrification start-up and operation process of internal circulation contact oxidation membrane bioreactor [J]. Huagong Jinzhan/Chemical Industry and Engineering Progress, 2019, 38 (09): : 3995 - 4002
- [3] NITRIFICATION FACILITIES START-UP AND INITIAL OPERATION [J]. JOURNAL WATER POLLUTION CONTROL FEDERATION, 1983, 55 (03): : 221 - 228
- [4] Influence of Temperature on the Start-up of Membrane Bioreactor: Kinetic Study [J]. FRONTIERS IN WASTEWATER TREATMENT AND MODELLING, FICWTM 2017, 2017, 4 : 165 - 171
- [7] Factors Influencing the Start-up and Stability of Partial Nitrification in a Continuous Flow Reactor [J]. 2011 INTERNATIONAL CONFERENCE ON ELECTRONICS, COMMUNICATIONS AND CONTROL (ICECC), 2011, : 4308 - 4311
- [9] Comparative analysis for community structure of AOB in start-up process of nitrification bioreactor [J]. Proceedings of the China Association for Science and Technology, Vol 2, No 1, 2006, : 658 - 662
- [10] Study on the Start-up and Operation of Partial Nitrification-Anammox in the Actual Landfill Leachate Treatment Project [J]. Beijing Daxue Xuebao (Ziran Kexue Ban)/Acta Scientiarum Naturalium Universitatis Pekinensis, 2021, 57 (02): : 275 - 282