Educational facility commissioning and project closeout checklist

被引:0
|
作者
Mckew, Amanda
机构
来源
Engineered Systems | 2009年 / 26卷 / 03期
关键词
Environmental design - Intelligent buildings - Personnel training;
D O I
暂无
中图分类号
学科分类号
摘要
Commissioning and project closeout checklist for outdoor dust collector and makeup air unit with barcode designation 11111 are presented. The basis of design include review and confirmation of design intent and review of BAS computer trending. Specification review include confirmation of Division 1 mechanical and electrical requirements and Division 17 building automation requirements. Building system demonstration include commissioning engineers facilitating functional performance tests (FPT), spot-check system training during the FPTs, and maintaining corrective action log and necessary retesting. LEED certification compliance include complete recommissioning manual and confirming LEED measuring and verification plan. Documentation to building manager include basis of design/design intent document, prefunctional performance test checklists, and field reports.
引用
收藏
相关论文
共 50 条
  • [1] McKay Bay waste-to-energy facility retrofit project closeout
    Schwartz, MP
    White, TM
    NAWTEC11: PROCEEDINGS OF THE 11TH ANNUAL NORTH AMERICAN WASTE TO ENERGY CONFERENCE, 2003, : 35 - 44
  • [2] The Josef underground educational facility project
    Pacovsky, J.
    Svoboda, J.
    Vasicek, R.
    UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 631 - 634
  • [3] Project Closeout Process Proves Costly
    Thomas, H. Randolph
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2011, 3 (04) : 178 - 179
  • [4] The commissioning of the BRISOL facility
    Tang, B.
    Cui, B.
    Chen, L.
    Huang, Q.
    Ma, R.
    Ma, Y.
    Ma, X.
    Zhang, T.
    Jiang, W.
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION B-BEAM INTERACTIONS WITH MATERIALS AND ATOMS, 2016, 376 : 429 - 433
  • [5] The LIL facility quadruplet commissioning
    Di-Nicola, J. M.
    Fleurot, N.
    Lonjaret, T.
    Julien, X.
    Bordenavel, E.
    Le Garrec, B.
    Mangeant, M.
    Behar, G.
    Chies, T.
    Feral, C.
    Graillot, H.
    Luttmann, M.
    Jequier, F.
    Journot, E.
    Lutz, O.
    Thiell, G.
    JOURNAL DE PHYSIQUE IV, 2006, 133 : 595 - 600
  • [6] Commissioning the DRAGON facility at ISAC
    Engel, S
    Hutcheon, D
    Bishop, S
    Buchmann, L
    Caggiano, J
    Chatterjee, ML
    Chen, AA
    D'Auria, J
    Gigliotti, D
    Greife, U
    Hunter, D
    Hussein, A
    Jewett, CC
    Laird, AM
    Lamey, M
    Liu, W
    Olin, A
    Ottewell, D
    Pearson, J
    Ruiz, C
    Ruprecht, G
    Trinczek, M
    Vockenhuber, C
    Wrede, C
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 2005, 553 (03): : 491 - 500
  • [7] Commissioning the Animal Facility for the Animals
    Watson, M.
    Wiler, R.
    Asghari, V.
    JOURNAL OF THE AMERICAN ASSOCIATION FOR LABORATORY ANIMAL SCIENCE, 2011, 50 (05): : 723 - 723
  • [8] Commissioning of the European XFEL Facility
    Noelle, D.
    ADVANCES IN X-RAY FREE-ELECTRON LASERS INSTRUMENTATION IV, 2017, 10237
  • [9] Causes, Implications, and Strategies for Project Closeout Delays in Highway Construction
    Tummalapudi, Manideep
    Harper, Christofer M.
    Taylor, Timothy R. B.
    Waddle, Steve
    Catchings, Rachel
    TRANSPORTATION RESEARCH RECORD, 2022, 2676 (09) : 479 - 490
  • [10] Using Basic Natural Language Processing for Effective Project Closeout Process
    Abdelaty, Ahmed
    Nesselhaue, Kevin
    CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 1111 - 1118