Educational facility commissioning and project closeout checklist

被引:0
|
作者
Mckew, Amanda
机构
来源
Engineered Systems | 2009年 / 26卷 / 03期
关键词
Environmental design - Intelligent buildings - Personnel training;
D O I
暂无
中图分类号
学科分类号
摘要
Commissioning and project closeout checklist for outdoor dust collector and makeup air unit with barcode designation 11111 are presented. The basis of design include review and confirmation of design intent and review of BAS computer trending. Specification review include confirmation of Division 1 mechanical and electrical requirements and Division 17 building automation requirements. Building system demonstration include commissioning engineers facilitating functional performance tests (FPT), spot-check system training during the FPTs, and maintaining corrective action log and necessary retesting. LEED certification compliance include complete recommissioning manual and confirming LEED measuring and verification plan. Documentation to building manager include basis of design/design intent document, prefunctional performance test checklists, and field reports.
引用
收藏
相关论文
共 50 条
  • [21] COMMISSIONING OF A TEST FACILITY FOR CALIBRATION OF ANEMOMETERS
    VANRENSBURG, JJ
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1975, 75 (09): : 239 - 244
  • [22] Commissioning and early experiments of the PHELIX facility
    V. Bagnoud
    B. Aurand
    A. Blazevic
    S. Borneis
    C. Bruske
    B. Ecker
    U. Eisenbarth
    J. Fils
    A. Frank
    E. Gaul
    S. Goette
    C. Haefner
    T. Hahn
    K. Harres
    H.-M. Heuck
    D. Hochhaus
    D. H. H. Hoffmann
    D. Javorková
    H.-J. Kluge
    T. Kuehl
    S. Kunzer
    M. Kreutz
    T. Merz-Mantwill
    P. Neumayer
    E. Onkels
    D. Reemts
    O. Rosmej
    M. Roth
    T. Stoehlker
    A. Tauschwitz
    B. Zielbauer
    D. Zimmer
    K. Witte
    Applied Physics B, 2010, 100 : 137 - 150
  • [23] Commissioning and first results of the OLMAT facility
    Tabares, Francisco L.
    Oyarzabal, Eider
    Alegre, Daniel
    Tafalla, David
    McCarthy, Kieran J.
    de Castro, Alfonso
    Ascasibar, Enrique
    Soleto, Alfonso
    Fernandez-Berceruelo, Ivan F.
    Carrasco, Ricardo
    Martin, Fernando
    Sebastian, Jose A.
    Gomez-Manchon, Jesus
    Pereira, Augusto
    de la Pena, Angel
    FUSION ENGINEERING AND DESIGN, 2023, 187
  • [24] Commissioning a museum and archival storage facility
    Ellis, Rebecca T.
    ASHRAE Transactions, 1996, 102 (01): : 476 - 481
  • [25] MICROGRAPHIC PROJECT CHECKLIST
    LEE, LS
    JOURNAL OF SYSTEMS MANAGEMENT, 1977, 28 (06): : 10 - 13
  • [26] CHECKLIST FOR PROJECT ENGINEERS
    ROSSNAGE.WB
    MACHINE DESIGN, 1967, 39 (10) : 206 - &
  • [27] The Monocot Checklist Project
    Govaerts, R
    TAXON, 2004, 53 (01) : 144 - 146
  • [28] Effective capital project commissioning
    Tribe, Michael G.
    Johnson, Rory R.
    IEEE CONFERENCE RECORD OF 2008 ANNUAL PULP AND PAPER INDUSTRY TECHNICAL CONFERENCE, 2008, : 106 - +
  • [29] The GTC project: Under commissioning
    Alvarez, P.
    Rodriguez Espinosa, J. M.
    Castro Lopez-Tarruella, F. J.
    Pi, M.
    Hammersley, P.
    Cavaller, L.
    Siegel, B.
    Molgo, J.
    Pancorbo, J.
    Ascanio, R.
    Prieto, G.
    Calvo, J.
    GROUND-BASED AND AIRBORNE TELESCOPES II, PTS 1-3, 2008, 7012
  • [30] PROJECT COMMISSIONING - STARTING IT RIGHT
    FRANKS, TR
    IRRIGATION: THEORY AND PRACTICE, 1989, : 767 - 777