Analysis of construction monitoring of large-section box culvert jacking process underpass expressway

被引:0
|
作者
State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan, Hubei 430071, China [1 ]
不详 [2 ]
不详 [3 ]
机构
来源
Yanshilixue Yu Gongcheng Xuebao | 2009年 / 9卷 / 1790-1797期
关键词
15;
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
相关论文
共 50 条
  • [1] Application and analysis of forepoling and large-section box culvert jacking for underpass highway construction
    Zhengzhou Supervise Bureau of Highway, Zhengzhou 450015, China
    不详
    Tumu Gongcheng Xuebao, 2008, 4 (106-111):
  • [2] Analytical solutions for surface deformation induced by jacking large-section pipe curtain box culvert
    Zhang, Kunyong
    Li, Danyang
    Zhang, Meng
    Shen, Xiaorui
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 47 (01): : 184 - 191
  • [3] Construction of a large-section long pedestrian underpass using pipe jacking in muddy silty clay: A case study
    Zhang, Dingwen
    Liu, Bo
    Qin, Yujun
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2016, 60 : 151 - 164
  • [4] Viscoelastic–plastic stability analysis of large-section quasi-rectangular pipe-jacking tunnel under-passing box culvert
    Jiancong Xu
    Yijie Huang
    Environmental Earth Sciences, 2024, 83
  • [5] Ground Settlement Law, Jacking Force Prediction, and Control Countermeasures for Large-Section Rectangular Pipe Jacking of National Highway Underpass
    Qian, Deyu
    Jiao, Hexi
    Li, Zexiang
    Zhu, Yingli
    Liu, Jiale
    Chen, Zhenglong
    Gao, Xing
    Liu, Hongwang
    Tao, Baihong
    Xu, Zixiang
    SUSTAINABILITY, 2023, 15 (17)
  • [6] Viscoelastic-plastic stability analysis of large-section quasi-rectangular pipe-jacking tunnel under-passing box culvert
    Xu, Jiancong
    Huang, Yijie
    ENVIRONMENTAL EARTH SCIENCES, 2024, 83 (02)
  • [7] Structural response of existed metro tunnels to adjacent large-section pipe jacking construction
    Liu, Bo
    Zhang, Dingwen
    Fang, Lei
    PROCEEDINGS OF THE INTERNATIONAL SCIENTIFIC CONFERENCE TRANSPORTATION GEOTECHNICS AND GEOECOLOGY (TGG-2017), 2017, 189 : 11 - 17
  • [8] Numerical Analysis on Large-Section Pipe Jacking within Close Distance in Soft Soil
    Xie, Xiaoli
    Ye, Bin
    IFCEE 2021: EARTH RETENTION, GROUND IMPROVEMENT, AND SEEPAGE CONTROL, 2021, 324 : 156 - 165
  • [9] ANALYSIS ON CONSTRUCTION MONITORING OF LARGE-SECTION HIGHWAY TUNNEL WITH ULTRA-SMALL SPACING
    Gong, Jian-Wu
    Xia, Cai-Chu
    Lei, Xue-Wen
    PROCEEDINGS OF THE ELEVENTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOL I AND II, 2010, : 1001 - 1005
  • [10] Analysis and monitoring on jacking construction of continuous box girder bridge
    Li, Fangyuan
    Wu, Peifeng
    Yan, Xinfei
    COMPUTERS AND CONCRETE, 2015, 16 (01): : 49 - 65