A Process-Improvement Method for Implementing Earned Value-Based Project Management in Organizations

被引:0
|
作者
Panquet, Quentin [1 ]
Bourgault, Mario [1 ]
Pellerin, Robert [1 ]
Danjou, Christophe [1 ]
Perrier, Nathalie [1 ]
机构
[1] Polytech Montreal, Succursale Ctr Ville, Dept Math & Ind Engn, CP 6079, Montreal, PQ H3C 3A7, Canada
关键词
Earned value management (EVM); Project management; Design research methodology (DRM);
D O I
10.1061/JCEMD4.COENG-15041
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Project monitoring has become crucial to the success of organizations in an increasingly competitive industrial environment. As such, earned value management (EVM) is an essential part of project cost control. Over the years, the scientific literature has mainly focused on developing mathematical models to improve EVM, whereas very few researchers have examined the implementation of EVM in organizations. Although some standards provide general guidelines for implementing the methodology, they rarely consider the maturity of the organization or the strategy required to implement it. This paper aims to develop an EVM implementation plan method for organizations. The method identifies the activities to be carried out, their sequencing, and the corresponding roles, techniques, and deliverables associated with each activity. The analysis of this phase of the existing situation allows for a consideration of the organization's maturity level based on a process mapping analysis and its audit of the organization. Relevant recommendations are then identified before defining EVM implementation strategies according to the organization's needs, constraints, and resources. Interviews with professionals allowed for the verification of the relevance of the recommendations before assigning them to the defined implementation strategies at every stage of implementation. The impact of each strategy on the organization's processes is mapped and analyzed to determine the expected costs and benefits. The implementation method was tested successfully within a firm.
引用
收藏
页数:17
相关论文
共 50 条
  • [41] Project control based on a mutual application of pert and earned value management methods
    Mishakova, Anastasiia
    Vakhrushkina, Anna
    Murgul, Vera
    Sazonova, Tatiana
    15TH INTERNATIONAL SCIENTIFIC CONFERENCE UNDERGROUND URBANISATION AS A PREREQUISITE FOR SUSTAINABLE DEVELOPMENT, 2016, 165 : 1812 - 1817
  • [42] Earned value-based performance monitoring of facility construction projects
    De Marco, Alberto
    Narbaev, Timur
    JOURNAL OF FACILITIES MANAGEMENT, 2013, 11 (01) : 69 - +
  • [43] Research on earned value method for software project tracking
    East China Institute of Computer Technology, Shanghai 200233, China
    Jisuanji Gongcheng, 2006, 15 (70-71+74):
  • [44] Earned value project management: Improving the predictive power of planned value
    Chen, Hong Long
    Chen, Wei Tong
    Lin, Ying Lien
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (01) : 22 - 29
  • [45] Case Study Narrative in Teaching Construction Project Management: Earned Value Method Examples
    Damnjanovic, Ivan
    Rispoli, James
    PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2014, 19 (01) : 41 - 49
  • [46] Performance Audit of Government Investment Project Based on Optimized Earned Value Method
    Li, Dong
    Zhao, Lidan
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 625 - 629
  • [47] Crisis management process for project-based organizations
    Iftikhar, Rehab
    Majeed, Mehwish
    Drouin, Nathalie
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2023, 16 (08) : 100 - 125
  • [48] Schedule-cost Joint Management of Thermal Power Construction Project Based on Improved Earned Value Method
    Wu, Meiqiong
    Wang, Meng
    Niu, Dongxiao
    PROCEEDINGS OF THE 2017 3RD INTERNATIONAL CONFERENCE ON HUMANITIES AND SOCIAL SCIENCE RESEARCH (ICHSSR 2017), 2017, 121 : 35 - 39
  • [49] Bringing value-based business process management to the operational process level
    Manuel Bolsinger
    Information Systems and e-Business Management, 2015, 13 : 355 - 398
  • [50] Bringing value-based business process management to the operational process level
    Bolsinger, Manuel
    INFORMATION SYSTEMS AND E-BUSINESS MANAGEMENT, 2015, 13 (02) : 355 - 398