A Process-Improvement Method for Implementing Earned Value-Based Project Management in Organizations

被引:0
|
作者
Panquet, Quentin [1 ]
Bourgault, Mario [1 ]
Pellerin, Robert [1 ]
Danjou, Christophe [1 ]
Perrier, Nathalie [1 ]
机构
[1] Polytech Montreal, Succursale Ctr Ville, Dept Math & Ind Engn, CP 6079, Montreal, PQ H3C 3A7, Canada
关键词
Earned value management (EVM); Project management; Design research methodology (DRM);
D O I
10.1061/JCEMD4.COENG-15041
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Project monitoring has become crucial to the success of organizations in an increasingly competitive industrial environment. As such, earned value management (EVM) is an essential part of project cost control. Over the years, the scientific literature has mainly focused on developing mathematical models to improve EVM, whereas very few researchers have examined the implementation of EVM in organizations. Although some standards provide general guidelines for implementing the methodology, they rarely consider the maturity of the organization or the strategy required to implement it. This paper aims to develop an EVM implementation plan method for organizations. The method identifies the activities to be carried out, their sequencing, and the corresponding roles, techniques, and deliverables associated with each activity. The analysis of this phase of the existing situation allows for a consideration of the organization's maturity level based on a process mapping analysis and its audit of the organization. Relevant recommendations are then identified before defining EVM implementation strategies according to the organization's needs, constraints, and resources. Interviews with professionals allowed for the verification of the relevance of the recommendations before assigning them to the defined implementation strategies at every stage of implementation. The impact of each strategy on the organization's processes is mapped and analyzed to determine the expected costs and benefits. The implementation method was tested successfully within a firm.
引用
收藏
页数:17
相关论文
共 50 条
  • [21] Value-Based Integrity Management and Bureaucratic Organizations: Changing the Mix
    Brewer, Brian
    Leung, Joan Y. H.
    Scott, Ian
    INTERNATIONAL PUBLIC MANAGEMENT JOURNAL, 2015, 18 (03) : 390 - 410
  • [22] Project cost forecasting based on earned value management and Markov chain
    Damavandi, Majid
    Tavakoli, Mahdieh
    Jolai, Fariborz
    ANNALS OF OPERATIONS RESEARCH, 2024,
  • [23] Implementing a Value-Based Complex Case Management Workshop to support Intellectual Disability and Autism care during the pandemic. A Quality Improvement Project
    Hasan, Syeda
    Spurrell, Mark
    INTERNATIONAL JOURNAL OF INTEGRATED CARE, 2022, 22
  • [24] Project Management Model: Integrating Earned Schedule, Quality, and Risk in Earned Value Management
    Miguel, Angelimarie
    Madria, Wira
    Polancos, Ronaldo
    2019 IEEE 6TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND APPLICATIONS (ICIEA), 2019, : 622 - 628
  • [25] Earned value analysis for software project based on function point method
    Lu, Xiangnan
    Bai, Xiaolong
    Wang, Shuyun
    PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2008, : 301 - 308
  • [26] THE IMPROVEMENT OF EARNED VALUE METHOD BASED ON THE INTEGRATED CONTROL OF "FOUR ELEMENTS"
    Li, Yaruo
    Guo, Jingjuan
    ICIM 2010: PROCEEDINGS OF THE TENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2010, : 278 - 283
  • [27] Research on Earned Value Based on the Critical Chain Management Method
    Zhang Changdong
    Zheng Shengqin
    CRIOCM2009: INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1-6, 2009, : 1766 - 1770
  • [28] Research on applications of the earned value management in the project cost management
    An, Yuhua
    Liu, Liqun
    Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 973 - 978
  • [29] Earned Green Value management for project management: A systematic review
    Koke, Benjamin
    Moehler, Robert C.
    JOURNAL OF CLEANER PRODUCTION, 2019, 230 : 180 - 197
  • [30] PILOT PROJECT FOR IMPLEMENTING VALUE-BASED HEALTHCARE IN RHEUMATOLOGY FOR INFLAMMATORY ARTHRITIS PATIENTS
    Dacheva, A.
    Vutova, Y.
    Djambazov, S.
    VALUE IN HEALTH, 2024, 27 (12) : S346 - S347