Case Study: Amesbury #5 Substation Power Transformer Emergency Relocation

被引:0
|
作者
Gavin, Carli [1 ]
机构
[1] Substation Engineering and Design Civil/Structural National Grid, Northboro,MA, United States
来源
关键词
Compendex;
D O I
暂无
中图分类号
学科分类号
摘要
Environmental management
引用
收藏
相关论文
共 50 条
  • [41] Simulation of electric power fluctuate affect transformer substation bus voltage wave by PSASP
    Xu Honglei
    Li Xiaohu
    Cao Yinli
    Yao Xu
    Kang Yi
    Li Xueshi
    ADVANCES IN POWER AND ELECTRICAL ENGINEERING, PTS 1 AND 2, 2013, 614-615 : 1416 - +
  • [42] Effect of Faults on Electrical Equipment in Power Substation: A Case Study of Metropolitan Electricity Authority's Power System
    Siriwithtayathanakun, P.
    Sriyanyong, P.
    2018 15TH INTERNATIONAL CONFERENCE ON ELECTRICAL ENGINEERING/ELECTRONICS, COMPUTER, TELECOMMUNICATIONS AND INFORMATION TECHNOLOGY (ECTI-CON), 2018, : 180 - 183
  • [43] Thermal analysis of an electric power transformer inside an enclosure–a case study
    Abdolzadeh M.
    Khoshabi A.
    Mehrabian M.A.
    Abdolzadeh, M. (mo.abdolzadeh@gmail.com), 1600, Taylor and Francis Ltd. (38): : 250 - 258
  • [44] Partial Discharge Measurement and Vibration Monitoring on Power Transformer Case Study on Power Transformer with High Level Noise (75.22 dB)
    Solin, I. K.
    Yolanda, O.
    Siregar, R.
    ICPADM 2009: PROCEEDINGS OF THE 9TH INTERNATIONAL CONFERENCE ON PROPERTIES AND APPLICATIONS OF DIELECTRIC MATERIALS, VOLS 1-3, 2009, : 521 - +
  • [45] Study on the navigation of patrol robot of transformer substation based on color vision and RFID
    Fan, Songhai
    Xia, Dongxue
    COMPUTATIONAL MATERIALS SCIENCE, PTS 1-3, 2011, 268-270 : 1259 - +
  • [46] Study on Transient Performance Testing Method of Electronic Current Transformer in Smart Substation
    Wang Xiao-ming
    Zhou Wei
    Zhou Ke
    Li Ming-po
    Wang Bin
    PROCEEDINGS OF THE 2017 2ND INTERNATIONAL CONFERENCE ON MATERIALS SCIENCE, MACHINERY AND ENERGY ENGINEERING (MSMEE 2017), 2017, 123 : 1638 - 1643
  • [47] Study and application of the fully insulated bench transformer substation of standard building blocks
    Gang, Wang
    PROCEEDINGS OF THE 2015 4TH INTERNATIONAL CONFERENCE ON COMPUTER, MECHATRONICS, CONTROL AND ELECTRONIC ENGINEERING (ICCMCEE 2015), 2015, 37 : 935 - 939
  • [48] Surge arrester requirements study for transformer protection in 132 W GIS substation
    Malek, Z. Abdul
    2007 CONFERENCE PROCEEDINGS IPEC, VOLS 1-3, 2007, : 494 - 499
  • [49] Analysis and remedial measures of the unsuccessful causes of the automatic backup power in 110 kV transformer substation
    Lengshuijiang Electric Power Bureau, Lengshuijiang 417500, China
    Dianli Xitong Baohu yu Kongzhi, 2009, 2 (91-92):
  • [50] Application of IEEE 1459-2010 for the power investigation a traction substation transformer secondary voltage
    Todorov, Oleh
    Bialobrzheskyi, Olexii
    Andrii, Sulym
    2020 IEEE KHPI WEEK ON ADVANCED TECHNOLOGY (KHPI WEEK), 2020, : 199 - 204