Metro Santo Domingo - construction of line 2 and operational experience on line 1

被引:0
|
作者
Puschmann, Rainer [1 ]
Toribio, Jose Ismael Nunez [2 ]
机构
[1] Siemens AG, Infrastructure and Cities, Siemens Rail Services, Sieboldstr. 16, 91052, Erlangen, Germany
[2] Siemens S.R.L., PCC Metro de Santo Domingo, Int. Reyes Católicos, Maximo Gómez Av., Santo Domingo, Dominican Republic
来源
eb - Elektrische Bahnen | 2011年 / 109卷 / 12期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:652 / 656
相关论文
共 50 条
  • [31] Geotechnical Conditions for Construction of Savski Trg Metro Station as a Part of the Belgrade Metro Line One
    Stanic, Nemanja
    Rakic, Dragoslav
    Isek, Josip
    Simic, Slavoljub
    PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON TRANSPORTATION GEOTECHNICS, VOL 3, ICTG 2024, 2025, 404 : 113 - 119
  • [32] BASE-LINE DATA ON AEDES-AEGYPTI POPULATIONS IN SANTO-DOMINGO, DOMINICAN-REPUBLIC
    TIDWELL, MA
    WILLIAMS, DC
    TIDWELL, TC
    PENA, CJ
    GWINN, TA
    FOCKS, DA
    ZAGLUL, A
    MERCEDES, M
    JOURNAL OF THE AMERICAN MOSQUITO CONTROL ASSOCIATION, 1990, 6 (03) : 514 - 522
  • [33] Prediction of Ground Subsidence During Underground Construction of Metro Line 2, Section 1, Ben Thanh - Tham Luong
    Luan, Vo Nhat
    Nu, Nguyen Thi
    Toan, Do Minh
    INZYNIERIA MINERALNA-JOURNAL OF THE POLISH MINERAL ENGINEERING SOCIETY, 2021, (02): : 543 - 554
  • [34] Construction risk assessment on deep foundation pits of a metro line in Shanghai
    Zhou, Hong-Bo
    Yao, Hao
    Lu, Jian-Hua
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2006, 28 (SUPPL.): : 1902 - 1906
  • [35] Real time monitoring during the Budapest metro line 4 construction
    Poitrineau, N.
    Gastine, E.
    Transport and City Tunnels - Proceedings of the 11th International Conference Underground Constructions Prague 2010, 2010, : 669 - 671
  • [36] EPB tunneling challenges in bouldery ground: a new experience on the Tabriz metro line 1, Iran
    Barzegari, Ghodrat
    Uromeihy, Ali
    Zhao, Jian
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2014, 73 (02) : 429 - 440
  • [37] EPB tunneling challenges in bouldery ground: a new experience on the Tabriz metro line 1, Iran
    Ghodrat Barzegari
    Ali Uromeihy
    Jian Zhao
    Bulletin of Engineering Geology and the Environment, 2014, 73 : 429 - 440
  • [38] Design of rainwater drainage for Harbin metro depot of line 1 of Harbin metro
    Wang, L.-C., 1600, Editorial Department of Journal of Railway Engineering Society, China (30):
  • [39] Transport capacity excavation of Beijing metro line 1
    Pan, X.-J. (panxiaohun59@hotmail.com), 1600, Science Press (13):
  • [40] Crossing of Line H under Line D, Buenos Aires Metro. Logistical challenges, construction and design
    Laiun, Jorge Gabriel
    Zielonka, Ezequiel Alejandro
    Sfriso, Alejo Oscar
    FROM FUNDAMENTALS TO APPLICATIONS IN GEOTECHNICS, 2015, : 2685 - 2692