共 50 条
- [31] Geotechnical Conditions for Construction of Savski Trg Metro Station as a Part of the Belgrade Metro Line One PROCEEDINGS OF THE 5TH INTERNATIONAL CONFERENCE ON TRANSPORTATION GEOTECHNICS, VOL 3, ICTG 2024, 2025, 404 : 113 - 119
- [33] Prediction of Ground Subsidence During Underground Construction of Metro Line 2, Section 1, Ben Thanh - Tham Luong INZYNIERIA MINERALNA-JOURNAL OF THE POLISH MINERAL ENGINEERING SOCIETY, 2021, (02): : 543 - 554
- [34] Construction risk assessment on deep foundation pits of a metro line in Shanghai Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2006, 28 (SUPPL.): : 1902 - 1906
- [35] Real time monitoring during the Budapest metro line 4 construction Transport and City Tunnels - Proceedings of the 11th International Conference Underground Constructions Prague 2010, 2010, : 669 - 671
- [37] EPB tunneling challenges in bouldery ground: a new experience on the Tabriz metro line 1, Iran Bulletin of Engineering Geology and the Environment, 2014, 73 : 429 - 440
- [38] Design of rainwater drainage for Harbin metro depot of line 1 of Harbin metro Wang, L.-C., 1600, Editorial Department of Journal of Railway Engineering Society, China (30):
- [39] Transport capacity excavation of Beijing metro line 1 Pan, X.-J. (panxiaohun59@hotmail.com), 1600, Science Press (13):
- [40] Crossing of Line H under Line D, Buenos Aires Metro. Logistical challenges, construction and design FROM FUNDAMENTALS TO APPLICATIONS IN GEOTECHNICS, 2015, : 2685 - 2692