Metro Santo Domingo - construction of line 2 and operational experience on line 1

被引:0
|
作者
Puschmann, Rainer [1 ]
Toribio, Jose Ismael Nunez [2 ]
机构
[1] Siemens AG, Infrastructure and Cities, Siemens Rail Services, Sieboldstr. 16, 91052, Erlangen, Germany
[2] Siemens S.R.L., PCC Metro de Santo Domingo, Int. Reyes Católicos, Maximo Gómez Av., Santo Domingo, Dominican Republic
来源
eb - Elektrische Bahnen | 2011年 / 109卷 / 12期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:652 / 656
相关论文
共 50 条
  • [41] Phase 1 of new Moscow Metro Line opened
    Smirnov, N
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 1996, 11 (02) : 243 - 243
  • [42] OPERATIONAL EXPERIENCE WITH A 2. 5 multiplied by 1. 5 METER DELAY LINE CHAMBER.
    Erwin, A.R.
    Chen, Hongfang
    Hasan, A.
    Hollenhorst, R.
    Kuhr, G.
    Kuehn, C.E.
    Nelson, K.S.
    Thompson, M.A.
    1600, (A237):
  • [43] Briefing: Human impact of Cairo Metro line 2
    Massoud, Omar W.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-ENGINEERING SUSTAINABILITY, 2011, 164 (03) : 171 - 175
  • [44] Panama Metro Bus System and Metro Line 1: An externalities analysis of CO2 emissions spectre
    Berbey-Alvarez, Aranzazu
    Guevara-Cedeno, Jessica
    Alvarez, Humberto
    Sanz Bobi, Juan de Dios
    2017 INTERNATIONAL CONFERENCE IN ENERGY AND SUSTAINABILITY IN SMALL DEVELOPING ECONOMIES (ES2DE), 2017,
  • [45] Anatomical and visual outcomes after Boston Keratoprosthesis type 1 in chemical burns: the Santo Domingo experience
    Culla, Borja Salvador
    Arzeno, Linette
    Kolovou, Paraskevi Evi
    Martinez, Santiago
    Dohlman, Claes H.
    Angel Lopez, Miguel
    INVESTIGATIVE OPHTHALMOLOGY & VISUAL SCIENCE, 2015, 56 (07)
  • [46] Construction of a new Metro line in Barcelona:: design criteria, excavation and monitoring system
    Schwarz, H.
    Bote, R.
    Gens, A.
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 2006, : 757 - +
  • [47] Protection of Historical Buildings in Metro Line Construction: A Case Study in Shanghai, China
    Fan F.
    Chen J.
    Wang J.
    Wang, Jianhua (wjh417@sjtu.edu.cn), 2018, Shanghai Jiaotong University (23): : 490 - 504
  • [48] Construction aspects for Lot 3 Sao Paulo Metro Line 5 Expansion
    Silva, M. A. A. P.
    Goncalves, F. L.
    Aguiar, F. L.
    Aguiar, G.
    Lemos, L. B.
    Soares, D., Jr.
    Mitrugno, D.
    Pradella, G.
    Grasso, P.
    UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 2218 - 2225
  • [49] Protection of Historical Buildings in Metro Line Construction:A Case Study in Shanghai,China
    范凡
    陈锦剑
    王建华
    Journal of Shanghai Jiaotong University(Science), 2018, 23 (04) : 490 - 504
  • [50] DESIGN, CONSTRUCTION AND 1ST EXPERIENCE WITH A PRODUCTION LINE OF GYPSUM BLOCKS
    BLOECH, H
    KAPPELMANN, W
    RENSINGHOFF, W
    ZEMENT-KALK-GIPS, 1991, 44 (08): : 421 - 425