Real time monitoring during the Budapest metro line 4 construction

被引:0
|
作者
Poitrineau, N. [1 ]
Gastine, E. [2 ]
机构
[1] SolData, Budapest, Hungary
[2] SolData, Nanterre, France
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The construction of the Budapest metro line 4, is currently on going. Since 2006, a complete real time monitoring system covering buildings, public utilities, underground water tables, ground deformations, noise and vibrations has been installed by SolData and its partners. All automatic measurement data is transmitted, wirelessly, to a central database to be visualised in 'real-time' using SolData's Geoscope monitoring software. The measurements are available remotely via interne for evaluation and interpretation by third parties, contractors, experts, engineers, allowing them to quickly execute safety and risk prevention measures if required. Additionally an advanced automatic alarm system has been implemented to increase project safety and to protect buildings.
引用
收藏
页码:669 / 671
页数:3
相关论文
共 50 条
  • [1] Preparatory works for the line 4 of the Budapest Metro network
    Kocsonya, P
    Soos, G
    TUNNELS FOR PEOPLE, VOLS 1 AND 2, 1997, : 201 - 206
  • [2] Monitoring of Metro Line C construction in Prague
    Vesely, V
    Kolesa, K
    Bucek, R
    GEOTECHNICAL MEASUREMENTS AND MODELLING, 2003, : 95 - 99
  • [3] Metro line No. 1 in Budapest
    Kadar, Peter
    PROCEEDINGS OF THE 2015 ICOHTEC/IEEE INTERNATIONAL HISTORY OF HIGH-TECHNOLOGIES AND THEIR SOCIO-CULTURAL CONTEXTS CONFERENCE (HISTELCON), 2015,
  • [4] Prediction of noise of the stations of the new Budapest metro line M4
    Augusztinovicz, F.
    Fuerjes, A. T.
    Marki, F.
    PROCEEDINGS OF INTERNATIONAL CONFERENCE ON NOISE AND VIBRATION ENGINEERING (ISMA2014) AND INTERNATIONAL CONFERENCE ON UNCERTAINTY IN STRUCTURAL DYNAMICS (USD2014), 2014, : 3413 - 3427
  • [5] Monitoring for construction of the North/South metro line in Amsterdam, The Netherlands
    van der Poel, J. T.
    Gastine, E.
    Kaalberg, E. J.
    Geotechnical Aspects of Underground Construction in Soft Ground, 2006, : 745 - 749
  • [6] Design and Construction of the Bridges on Guangzhou Metro Line 4
    He, X. H.
    Meng, X. L.
    Li, L. J.
    PROCEEDINGS OF THE TWELFTH EAST ASIA-PACIFIC CONFERENCE ON STRUCTURAL ENGINEERING AND CONSTRUCTION (EASEC12), 2011, 14
  • [7] Convergence and Settlement Monitoring During Construction of Metro Tunnels
    Liu Shaotang
    Ji Zhigang
    Liang Yubao
    Fan Wenping
    Liao Zhongping
    ACUUS2009: PROCEEDINGS OF 12TH INTERNATIONAL CONFERENCE OF THE ASSOCIATED RESEARCH CENTERS FOR URBAN UNDERGROUND SPACE, 2009, : 464 - 469
  • [8] Variations of the gravity field due to excavations of the Budapest Metro4 subway line
    Egeto, Csaba
    Rehany, Nikolett
    Foeldvary, Lorant
    PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2014, 58 (02): : 131 - 136
  • [9] Real-Time Safety Risk Identification Model during Metro Construction Adjacent to Buildings
    Zhang, Sherong
    Shang, Chao
    Wang, Chao
    Song, Ran
    Wang, Xiaohua
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (06)
  • [10] Traffic Impact Analysis of Metro Line 1 in Zhengzhou during Metro Construction Period
    Wei Zhonghua
    Gong Ming
    Cao Jia
    Guo Ruili
    2011 3RD WORLD CONGRESS IN APPLIED COMPUTING, COMPUTER SCIENCE, AND COMPUTER ENGINEERING (ACC 2011), VOL 3, 2011, 3 : 630 - +