The construction of the Budapest metro line 4, is currently on going. Since 2006, a complete real time monitoring system covering buildings, public utilities, underground water tables, ground deformations, noise and vibrations has been installed by SolData and its partners. All automatic measurement data is transmitted, wirelessly, to a central database to be visualised in 'real-time' using SolData's Geoscope monitoring software. The measurements are available remotely via interne for evaluation and interpretation by third parties, contractors, experts, engineers, allowing them to quickly execute safety and risk prevention measures if required. Additionally an advanced automatic alarm system has been implemented to increase project safety and to protect buildings.
引用
收藏
页码:669 / 671
页数:3
相关论文
共 50 条
  • [41] Construction of the new 'Meteor' automated metro line in Paris
    David, H
    TUNNELS AND METROPOLISES, VOLS 1 AND 2, 1998, : 167 - 172
  • [42] On-line automatic sampling for real time monitoring of wastewaters
    Univ of New South Wales, Sydney
    Water Res, 11 (2651-2654):
  • [43] On-line automatic sampling for real time monitoring of wastewaters
    Guang, D
    Wiley, DE
    Hlavacek, M
    Fane, AG
    WATER RESEARCH, 1996, 30 (11) : 2651 - 2654
  • [44] Field Monitoring of Segments Deformation during Metro-station Construction Based on Shield Tunneling
    Li, Tao
    Liu, Yingchao
    Liu, Bo
    Yang, Weihong
    Liu, Yang
    PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 1785 - 1789
  • [45] Remote monitoring system applied to the construction of metro station undercrossing existing metro tunnel
    Zhang Cheng-ping
    Zhang Ding-li
    Luo Jian-jun
    Wang Meng-shu
    Wu Jie-pu
    ROCK AND SOIL MECHANICS, 2009, 30 (06) : 1861 - 1866
  • [46] Stress monitoring and internal force analysis of Guangzhou metro shield tunnel segment during construction
    Guangzhou Institute of Building Science, Guangzhou 510440, China
    Tumu Gongcheng Xuebao, 2009, 3 (118-124):
  • [47] PLC and SCADA based Real Time Monitoring and Train Control System for the Metro Railways Infrastructure
    Ishu Tomar
    Indu Sreedevi
    Neeta Pandey
    Wireless Personal Communications, 2023, 129 : 521 - 548
  • [48] In situ monitoring of the Lyons Metro D line extension
    Kastner, R
    Ollier, C
    Guibert, G
    GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 1996, : 701 - 706
  • [49] PLC and SCADA based Real Time Monitoring and Train Control System for the Metro Railways Infrastructure
    Tomar, Ishu
    Sreedevi, Indu
    Pandey, Neeta
    WIRELESS PERSONAL COMMUNICATIONS, 2023, 129 (01) : 521 - 548
  • [50] Metro Santo Domingo - construction of line 2 and operational experience on line 1
    Puschmann, Rainer
    Toribio, Jose Ismael Nunez
    eb - Elektrische Bahnen, 2011, 109 (12): : 652 - 656