共 50 条
- [2] Application of AGF to Shanghai Metro 1(#) line construction GROUND FREEZING 97: FROST ACTION IN SOILS, 1997, : 509 - 512
- [3] Traffic Impact Analysis of Metro Line 1 in Zhengzhou during Metro Construction Period 2011 3RD WORLD CONGRESS IN APPLIED COMPUTING, COMPUTER SCIENCE, AND COMPUTER ENGINEERING (ACC 2011), VOL 3, 2011, 3 : 630 - +
- [4] Properties of frozen soils for cross passage construction in line 1 and 2 of Wuxi Metro ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 1662 - 1665
- [5] Monitoring of Metro Line C construction in Prague GEOTECHNICAL MEASUREMENTS AND MODELLING, 2003, : 95 - 99
- [7] Construction of Line 1 Bis of the Metro in the Urban Community of Lille. Travaux Paris, 1986, (609): : 17 - 26
- [8] Metro Doha Green Line: Fibre reinforced tunnel linings – Design and construction experience Geomechanik und Tunnelbau, 2021, 14 (04): : 347 - 355
- [9] DEFORMATION CONTROL OF METRO CONSTRUCTION CROSSING EXISTING METRO LINE BASED ON CONSTRUCTION PROCEDURE OPTIMIZATION KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 453 - 458
- [10] Design and Construction of the Bridges on Guangzhou Metro Line 4 PROCEEDINGS OF THE TWELFTH EAST ASIA-PACIFIC CONFERENCE ON STRUCTURAL ENGINEERING AND CONSTRUCTION (EASEC12), 2011, 14