Numerical Research on the Load Transfer and Settlement of Composite Structural Subgrade of High-speed Railway

被引:0
|
作者
Lv, Xi-Lin [1 ]
Ma, Quan [2 ]
机构
[1] Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai,200092, China
[2] Tongji University, Shanghai,200092, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
8
引用
收藏
页码:1 / 6
相关论文
共 50 条
  • [1] Review of research on high-speed railway subgrade settlement in soft soil area
    Shunhua Zhou
    Binglong Wang
    Yao Shan
    Railway Engineering Science, 2020, 28 : 129 - 145
  • [2] Review of research on high-speed railway subgrade settlement in soft soil area
    Zhou, Shunhua
    Wang, Binglong
    Shan, Yao
    RAILWAY ENGINEERING SCIENCE, 2020, 28 (02) : 129 - 145
  • [3] Review of research on high-speed railway subgrade settlement in soft soil area
    Shunhua Zhou
    Binglong Wang
    Yao Shan
    Railway Engineering Science, 2020, 28 (02) : 129 - 145
  • [4] Review of research on high-speed railway subgrade settlement in soft soil area
    Shunhua Zhou
    Binglong Wang
    Yao Shan
    Railway Engineering Science, 2020, (02) : 129 - 145
  • [5] EXPERIMENT OF HIGH-SPEED RAILWAY SUBGRADE SETTLEMENT PREDICTION ANALYSIS
    Zhang, Guangli
    Tan, Qulin
    Li, Leijuan
    CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 453 - 458
  • [6] Settlement limit values for box subgrade of high-speed railway
    Yu L.
    Zhu Z.
    Qin Y.
    Wang X.
    Wang Y.
    Zheng W.
    Journal of Railway Science and Engineering, 2023, 20 (09) : 3203 - 3216
  • [7] Study on Settlement Property and Prediction for High-speed Railway Subgrade
    Feng H.
    Geng H.
    Ma D.
    Chang J.
    Li L.
    Tiedao Xuebao/Journal of the China Railway Society, 2017, 39 (11): : 138 - 143
  • [8] OPTIMIZATION OF SUBGRADE DIFFERENTIAL SETTLEMENT DETECTION METHOD OF HIGH-SPEED RAILWAY
    Shan, Wendi
    Cai, Xiaopei
    NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 449 - 453
  • [9] Subgrade settlement of high-speed railway in seasonal frozen soil area
    Zhang, Shuang
    Tang, Chun-An
    Zhang, Xiang-Dong
    Zhang, S. (wangtaochunyan@126.com), 2013, Northeast University (34): : 1202 - 1205
  • [10] NUMERICAL SIMULATION OF KARST SUBGRADE STABILITY OF HIGH-SPEED RAILWAY
    Chen, Weiqiang
    Ye, Tangjin
    Xe, Qiang
    NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 435 - +