Numerical Research on the Load Transfer and Settlement of Composite Structural Subgrade of High-speed Railway

被引:0
|
作者
Lv, Xi-Lin [1 ]
Ma, Quan [2 ]
机构
[1] Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University, Shanghai,200092, China
[2] Tongji University, Shanghai,200092, China
关键词
D O I
暂无
中图分类号
学科分类号
摘要
8
引用
收藏
页码:1 / 6
相关论文
共 50 条
  • [21] Study on the Evaluation Method of Subgrade Settlement Caused by Structure Layer of the High-Speed Railway
    Jiang, Lingfa
    Xiong, Shudan
    Xu, Xichang
    Chen, Shanxiong
    APPLIED MECHANICS AND CIVIL ENGINEERING II, 2012, 188 : 72 - 77
  • [22] A new method for measuring subgrade settlement in high-speed railway by using a linear CCD
    Yang Jing
    Feng Qi-bo
    MEASUREMENT, 2013, 46 (05) : 1751 - 1756
  • [23] Cumulative settlement of track subgrade in high-speed railway under varying water levels
    Chen, Renpeng
    Chen, Jinmiao
    Zhao, Xing
    Bian, Xuecheng
    Chen, Yunmin
    INTERNATIONAL JOURNAL OF RAIL TRANSPORTATION, 2014, 2 (04) : 205 - 220
  • [24] Ground vibration characteristics of high-speed railway induced by uneven settlement of subgrade with train speed increasing
    Jiang H.
    Li Y.
    Chi H.
    Liu S.
    Liang M.
    Yao Z.
    Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition), 2021, 51 (03): : 442 - 448
  • [25] A numerical simulation study on the settlement laws of the high-speed railway's subgrade induced by the construction of twin shield tunnel
    Xu, You-Jun
    Tao, Lian-Jin
    Li, Wen-Bo
    Fan, Jun-Yi
    Wang, Wen-Pei
    Beijing Gongye Daxue Xuebao/Journal of Beijing University of Technology, 2010, 36 (12): : 1618 - 1623
  • [26] Numerical Analysis to Impact of Different Heights for Subgrade Connecting in High-Speed Railway
    Yuan, Jianyi
    Lv, Yayu
    ADVANCES IN BUILDING MATERIALS, PTS 1-3, 2011, 168-170 : 1256 - 1259
  • [27] Control and evaluation for residual subgrade settlement of high speed railway
    Li, X. H.
    Chen, Z.
    Zhao, X. Y.
    Sun, H. L.
    Guo, J. H.
    Zhao, T.
    HARMONISING ROCK ENGINEERING AND THE ENVIRONMENT, 2012, : 1947 - 1952
  • [28] Study on Settlement Combination Prediction of High Fill Subgrade in Turnout Area of High-speed Railway Station
    Ma X.
    Chen Y.
    Wang X.
    Tiedao Xuebao/Journal of the China Railway Society, 2023, 45 (01): : 105 - 113
  • [29] Research on effect of train running on elevated line of high-speed railway on existing railway subgrade
    Shi Jin
    Zou Kai
    Gu Ai-jun
    Jiang Hui
    Liang Qing-huai
    ROCK AND SOIL MECHANICS, 2013, 34 : 285 - 290
  • [30] STUDY ON PREDICTION METHODS FOR SUBGRADE SETTLEMENT OF HIGH-SPEED RAILWAY USING GRAY NEURAL NETWORK
    Pu, Xingbo
    Wei, Jing
    Wei, Ping
    Li, Wenfan
    NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 426 - +