Double-population quasi particle swarm optimization for solving resource-constrained scheduling problem

被引:0
|
作者
He, Jieguang [1 ]
Chen, Xindu [1 ]
Chen, Xin [1 ]
Liu, Qiang [1 ]
机构
[1] Guangdong Provincial Key Laboratory of Computer Integrated Manufacturing System, Guangdong University of Technology, Guangzhou,510006, China
来源
Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS | 2015年 / 21卷 / 09期
关键词
D O I
10.13196/j.cims.2015.09.021
中图分类号
学科分类号
摘要
引用
收藏
页码:2446 / 2457
相关论文
共 50 条
  • [41] Modeling and solving the resource-constrained project scheduling problem with activities overlapping
    Yu, Jing
    Xu, Zhe
    Li, Hong-Bo
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2015, 35 (05): : 1236 - 1245
  • [42] Solving Resource-Constrained Project Scheduling Problem via Genetic Algorithm
    Liu, Jia
    Liu, Yisheng
    Shi, Ying
    Li, Jian
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2020, 34 (02)
  • [43] Resource Constrained Project Scheduling Using Particle Swarm Optimization
    Wang, Jiancheng
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON APPLIED MATHEMATICS, SIMULATION AND MODELLING, 2016, 41 : 387 - 392
  • [44] A GRASP for a resource-constrained scheduling problem
    Sirdey R.
    Carlier J.
    Nace D.
    International Journal of Innovative Computing and Applications, 2010, 2 (03) : 143 - 149
  • [45] Robust scheduling and optimization for resource-constrained project scheduling problem with transfer times
    Hu X.
    Liang S.
    Wang J.
    Cui N.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (12): : 4191 - 4205
  • [46] Train Operation Strategy Optimization Based on a Double-Population Genetic Particle Swarm Optimization Algorithm
    Liu, Kaiwei
    Wang, Xingcheng
    Qu, Zhihui
    ENERGIES, 2019, 12 (13)
  • [47] Cat swarm Optimization-based schemes for resource-constrained project scheduling
    Xu, Long
    Hu, Wenbin
    ADVANCES IN MANUFACTURING TECHNOLOGY, PTS 1-4, 2012, 220-223 : 251 - 258
  • [48] Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem
    Paweł B. Myszkowski
    Marek E. Skowroński
    Łukasz P. Olech
    Krzysztof Oślizło
    Soft Computing, 2015, 19 : 3599 - 3619
  • [49] Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem
    Myszkowski, Pawel B.
    Skowronski, Marek E.
    Olech, Lukasz P.
    Oslizlo, Krzysztof
    SOFT COMPUTING, 2015, 19 (12) : 3599 - 3619
  • [50] Solving a multi-objective resource-constrained project scheduling problem using a cuckoo optimization algorithm
    Ghamginzadeh, A.
    Najafi, A. A.
    Azimi, P.
    SCIENTIA IRANICA, 2014, 21 (06) : 2419 - 2428