共 50 条
- [41] Modeling and solving the resource-constrained project scheduling problem with activities overlapping Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2015, 35 (05): : 1236 - 1245
- [43] Resource Constrained Project Scheduling Using Particle Swarm Optimization PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON APPLIED MATHEMATICS, SIMULATION AND MODELLING, 2016, 41 : 387 - 392
- [45] Robust scheduling and optimization for resource-constrained project scheduling problem with transfer times Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (12): : 4191 - 4205
- [47] Cat swarm Optimization-based schemes for resource-constrained project scheduling ADVANCES IN MANUFACTURING TECHNOLOGY, PTS 1-4, 2012, 220-223 : 251 - 258
- [48] Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem Soft Computing, 2015, 19 : 3599 - 3619