Key techniques for construction of open caissons of main ship channel bridge of Hutong Changjiang River Bridge

被引:0
|
作者
Li, Jun-Tang [1 ]
机构
[1] China Railway Major Bridge Engineering Group Co., Ltd., Wuhan,430050, China
关键词
Reinforced concrete - Caissons - Piles - Pressure vessels - Ships - Anchorages (foundations) - Highway bridges - Roads and streets - Bridge cables - Piers;
D O I
暂无
中图分类号
学科分类号
摘要
The main ship channel bridge of the Hutong Changjiang River Bridge is a rail-cum-road steel truss girder cable-stayed bridge with span arrangement (140+462+1092+462+140) m. The foundations for the 6 piers of the main ship channel bridge are all the open caissons, the upper parts of which are the reinforced concrete structures while the lower parts are the steel structures. Of the caissons, the plan dimensions of the caissons of the pylon piers are 86.9 m×58.7 m and in the plan, 24 nos. of the well holes in dimensions of 12.8 m×12.8 m are arranged for each caisson. The plan dimensions of the caissons of the side and auxiliary piers are 39.2 m×26.8 m. To resolve the problems of the floating, positioning and landing of the steel caissons onto the riverbed under the tremendous current forces and to ensure the construction quality, the steel caissons of the pylon piers were integrally manufactured in the workshop, integrally floated out from the shipyard by the floating aid measure of temporarily closing the 12 well holes in a caisson and the caissons were rapidly positioned in multiple directions, using the technique of the large diameter steel pipe pile anchorage system and hydraulic jacks. The caissons of the side and auxiliary piers were also integrally manufactured in the workshop, were integrally transported, lifted and installed in each two lifts of a caisson and were positioned, using the technique of the large diameter steel pipe piles inside the caissons. At the main pier No. 29, the technique of the riverbed pre-protection was applied. With all these key techniques as mentioned, the open caissons of the 6 piers of the main ship channel bridge have all reached their stable depth and the construction effect is sound. © 2015, Journal Press, China Railway Bridge Science. All right reserved.
引用
收藏
页码:12 / 17
相关论文
共 50 条
  • [41] Construction techniques for foundation of main pier No.3 of new baishatuo changjiang river bridge
    Zhou, Gong-Jian
    Bridge Construction, 2015, 45 (01) : 1 - 5
  • [43] Design of main bridge of Cuntan Changjiang River Bridge in Chongqing
    Tang, H.-Q. (tanghq@brdi.com.cn), 1600, Wuhan Bridge Research Institute (43):
  • [44] Design of Main Bridge of Baiyang Changjiang River Highway Bridge
    Shu, Jiang
    Liu, Qi
    Peng, Yuan-Cheng
    Bridge Construction, 2019, 49 (01) : 77 - 82
  • [45] Design of Main Bridge of Pailou Changjiang River Bridge in Wanzhou
    Liu, Ke-Feng
    Cai, Dun-Song
    Yang, Guang-Wu
    Bridge Construction, 2020, 50 : 109 - 114
  • [46] Design of Main Bridge of Zhuankou Changjiang River Highway Bridge
    Feng, Peng-Cheng
    Ding, Ren-Jun
    Chen, Yi-Ming
    Fu, Kun
    Liu, Qi
    Bridge Construction, 2017, 47 (04): : 1 - 6
  • [47] Overall Design of Main Bridge of Wufengshan Changjiang River Bridge
    Tang, He-Qiang
    Xu, Gong-Yi
    Liu, Han-Shun
    Bridge Construction, 2020, 50 (06) : 1 - 7
  • [48] Research on Pylon Foundation Types for Main Navigational Channel Bridge of Changtai Changjiang River Bridge
    Hu, Yong
    Bridge Construction, 2021, 51 (02) : 1 - 9
  • [49] Overall Design and Concept Development for Main Navigational Channel Bridge of Changtai Changjiang River Bridge
    Qin, Shun-Quan
    Xu, Wei
    Lu, Qin-Feng
    Zheng, Qing-Gang
    Fu, Zhan-Gong
    Yuan, Ren-An
    Sun, Jian-Li
    Bridge Construction, 2020, 50 (03) : 1 - 10
  • [50] Key Construction Techniques for Section Steel Anchor System of Yangsigang Changjiang River Bridge in Wuhan
    Li Y.-Q.
    Shen S.-J.
    Bridge Construction, 2023, 53 (02) : 135 - 141