Key techniques for construction of open caissons of main ship channel bridge of Hutong Changjiang River Bridge

被引:0
|
作者
Li, Jun-Tang [1 ]
机构
[1] China Railway Major Bridge Engineering Group Co., Ltd., Wuhan,430050, China
关键词
Reinforced concrete - Caissons - Piles - Pressure vessels - Ships - Anchorages (foundations) - Highway bridges - Roads and streets - Bridge cables - Piers;
D O I
暂无
中图分类号
学科分类号
摘要
The main ship channel bridge of the Hutong Changjiang River Bridge is a rail-cum-road steel truss girder cable-stayed bridge with span arrangement (140+462+1092+462+140) m. The foundations for the 6 piers of the main ship channel bridge are all the open caissons, the upper parts of which are the reinforced concrete structures while the lower parts are the steel structures. Of the caissons, the plan dimensions of the caissons of the pylon piers are 86.9 m×58.7 m and in the plan, 24 nos. of the well holes in dimensions of 12.8 m×12.8 m are arranged for each caisson. The plan dimensions of the caissons of the side and auxiliary piers are 39.2 m×26.8 m. To resolve the problems of the floating, positioning and landing of the steel caissons onto the riverbed under the tremendous current forces and to ensure the construction quality, the steel caissons of the pylon piers were integrally manufactured in the workshop, integrally floated out from the shipyard by the floating aid measure of temporarily closing the 12 well holes in a caisson and the caissons were rapidly positioned in multiple directions, using the technique of the large diameter steel pipe pile anchorage system and hydraulic jacks. The caissons of the side and auxiliary piers were also integrally manufactured in the workshop, were integrally transported, lifted and installed in each two lifts of a caisson and were positioned, using the technique of the large diameter steel pipe piles inside the caissons. At the main pier No. 29, the technique of the riverbed pre-protection was applied. With all these key techniques as mentioned, the open caissons of the 6 piers of the main ship channel bridge have all reached their stable depth and the construction effect is sound. © 2015, Journal Press, China Railway Bridge Science. All right reserved.
引用
收藏
页码:12 / 17
相关论文
共 50 条
  • [22] Overall design of Hutong Changjiang River Bridge
    Gao, Zong-Yu
    Mei, Xin-Yong
    Xu, Wei
    Zhang, Yan-Fei
    Bridge Construction, 2015, 45 (06) : 1 - 6
  • [24] Design of Special Ship Channel Bridge of Changtai Changjiang River Bridge
    Xu, Wei
    Wang, Heng
    Li, Shao-Jun
    Bridge Construction, 2020, 50 (06) : 85 - 90
  • [25] Key Construction Control Techniques of Baijusi Changjiang River Bridge in Chongqing
    Zhou, Hao
    Zheng, Jianxin
    Zhu, Hao
    Bridge Construction, 2024, 54 (04) : 141 - 148
  • [26] Technique of Controlling Temperature Field and Concrete Expansion to Limit Cracking in Pylons of Main Navigational Channel Bridge of Hutong Changjiang River Bridge
    Xu, Wen
    Yan, Zhi-Gang
    Zhang, Shi-Shan
    Liu, Jia-Ping
    Bridge Construction, 2020, 50 (01) : 44 - 49
  • [27] Key Construction Techniques for Cofferdam of Pier Z4 of Main Navigation Channel Bridge of Maanshan Changjiang River Rail-cum-Road Bridge
    Dun L.
    Wang L.-X.
    Bridge Construction, 2023, 53 (02) : 10 - 16
  • [28] Construction Techniques for Side Span Composite Girder of Main Bridge of Qingshan Changjiang River Bridge in Wuhan
    Zhang, Chun-Xin
    Hu, Jun
    Xie, Hong-Yue
    Bridge Construction, 2019, 49 (01) : 1 - 6
  • [29] Key Techniques for Construction of North Pylon of Qingshan Changjiang River Bridge in Wuhan
    Zhang, Chun-Xin
    Zhang, Jing
    Hu, Hai-Bo
    Bridge Construction, 2019, 49 (02) : 1 - 6
  • [30] Construction Schemes for Main Bridge of Qingshan Changjiang River Highway Bridge in Wuhan
    Wang, Yin-Feng
    Hu, Jun
    Fang, Li-Jun
    Zhang, Jing
    Bridge Construction, 2020, 50 : 112 - 118