Key techniques for construction of open caissons of main ship channel bridge of Hutong Changjiang River Bridge

被引:0
|
作者
Li, Jun-Tang [1 ]
机构
[1] China Railway Major Bridge Engineering Group Co., Ltd., Wuhan,430050, China
关键词
Reinforced concrete - Caissons - Piles - Pressure vessels - Ships - Anchorages (foundations) - Highway bridges - Roads and streets - Bridge cables - Piers;
D O I
暂无
中图分类号
学科分类号
摘要
The main ship channel bridge of the Hutong Changjiang River Bridge is a rail-cum-road steel truss girder cable-stayed bridge with span arrangement (140+462+1092+462+140) m. The foundations for the 6 piers of the main ship channel bridge are all the open caissons, the upper parts of which are the reinforced concrete structures while the lower parts are the steel structures. Of the caissons, the plan dimensions of the caissons of the pylon piers are 86.9 m×58.7 m and in the plan, 24 nos. of the well holes in dimensions of 12.8 m×12.8 m are arranged for each caisson. The plan dimensions of the caissons of the side and auxiliary piers are 39.2 m×26.8 m. To resolve the problems of the floating, positioning and landing of the steel caissons onto the riverbed under the tremendous current forces and to ensure the construction quality, the steel caissons of the pylon piers were integrally manufactured in the workshop, integrally floated out from the shipyard by the floating aid measure of temporarily closing the 12 well holes in a caisson and the caissons were rapidly positioned in multiple directions, using the technique of the large diameter steel pipe pile anchorage system and hydraulic jacks. The caissons of the side and auxiliary piers were also integrally manufactured in the workshop, were integrally transported, lifted and installed in each two lifts of a caisson and were positioned, using the technique of the large diameter steel pipe piles inside the caissons. At the main pier No. 29, the technique of the riverbed pre-protection was applied. With all these key techniques as mentioned, the open caissons of the 6 piers of the main ship channel bridge have all reached their stable depth and the construction effect is sound. © 2015, Journal Press, China Railway Bridge Science. All right reserved.
引用
收藏
页码:12 / 17
相关论文
共 50 条
  • [31] Pylon Design for Main Navigational Channel Bridge of Changtai Changjiang River Bridge
    Zhang, Jin-Tao
    Fu, Zhan-Gong
    Qin, Shun-Quan
    Jiang, Zhen-Xiong
    Zhang, Rui
    Bridge Construction, 2022, 52 (05) : 1 - 7
  • [32] Construction Scheme of Main Navigation Channel Bridge of Maanshan Changjiang River Rail-cum-Road Bridge
    Liu A.
    Shen D.
    Bridge Construction, 2023, 53 (06) : 10 - 17
  • [33] Construction techniques for closure of side span steel girder of main bridge of Anqing Changjiang River Railway Bridge
    Sun, Jian-Jia
    Bridge Construction, 2014, 44 (03) : 109 - 113
  • [35] Key Construction Techniques for Main Bridge of Yachi River Bridge on Chengdu-Guiyang Railway
    Li, Yan-Zhe
    Bridge Construction, 2020, 50 (05) : 16 - 21
  • [36] Construction techniques for demolition of main bridge of Liuxi River Bridge
    1600, Wuhan Bridge Research Institute (44):
  • [37] Key techniques for construction of Huanggang Changjiang River Rail-cum-Road Bridge
    Liu, Jie-Wen
    Zhang, Hong-Xin
    Zhou, Ming-Xing
    Deng, Yong-Feng
    Bridge Construction, 2013, 43 (02) : 1 - 9
  • [38] Research on Pylon Types for Main Navigational Channel Bridge of Changtai Changjiang River Bridge
    Qin, Shun-Quan
    Zhang, Jin-Tao
    Lu, Qin-Feng
    Fu, Zhan-Gong
    Zhang, Rui
    Bridge Construction, 2021, 51 (04) : 1 - 9
  • [39] Key Construction Techniques of Extra Wide Steel Box Girders in Main Bridge of Lingang Changjiang River Rail-cum-Road Bridge in Yibin
    Yang R.
    Chen Z.
    Yu Z.
    Chen B.
    Hua S.
    Bridge Construction, 2024, 54 (01) : 16 - 22
  • [40] Control Techniques for Superstructure Construction of Wufengshan Changjiang River Bridge
    Feng, Chuan-Bao
    Bridge Construction, 2020, 50 (01) : 99 - 104