Analysis on temporary connection mode of the large-span steel truss girder suspension bridge

被引:0
|
作者
Zhang, Haishun [1 ,2 ]
机构
[1] China Railway Construction Bridge Engineering Bureau Group Co., Ltd., Tianjin,300300, China
[2] Tianjin University, Tianjin,300072, China
关键词
Suspension bridges;
D O I
暂无
中图分类号
学科分类号
摘要
During the construction of large-span steel truss girder suspension bridge, the temporary connection between steel truss girder segments has great influences on its construction. Different connection ways may directly affect the real-time and the bridge-completion internal force distributions of truss structure. With the Yangsigang Yangtze river highway bridge project taken as an example, three connection ways, including the gradually hinged method, gradually rigid-connecting method and timely hinged method, were compared and analyzed. The parameters or variables for comparison were the forces, cable force, etc. in steel truss girder member and temporary connection. The research conclusions indicate that, the gradually rigid-connecting method is infeasible because it can't ensure the structural safety, while the gradually hinged method and the timely hinged method can guarantee the structural safety. For the timely hinged method, the work difficulty may be increased as the simulation calculations and the field monitoring analysis are often combined for determining the hinging moment of steel truss girder, and the whole rigidity and stability of structure with the temporary connection measures of the lower chord are better compared to the gradually hinged method. In addition, counterweight was increased appropriately in the girder erection process for making the main cable and girder close to the curve shape of bridge-completion and reducing the forces of the temporary connection. Based on the research of timely hinged method, the timely hinged method without counterweight, the timely hinged method with equal counterweight and the timely hinged method with partial counterweight were compared for analyzing the effects of counterweight on steel truss girder. The research conclusions show that when the timely hinged method with partial counterweight is used, the indicators of truss girder and suspension cable are appropriate. Compared to the timely hinged method without counterweight, the timely hinged method with partial counterweight can close the lower chord into the hinged state in advance, enhancing the stiffness and stability of main girder structure. Compared to the timely hinged method with equal counterweight, the cable force of the timely hinged method with partial counterweight meet the requirements on safety factor, implying that it is an optimal way of temporary connection. © 2020, Editorial Office of China Civil Engineering Journal. All right reserved.
引用
收藏
页码:98 / 105
相关论文
共 50 条
  • [31] Large span continuous girder bridge jacking steel hoop stress analysis
    Chen, Zhou
    Yan, Quansheng
    Jia, Buyu
    Yu, Xiaolin
    CONSTRUCTION AND URBAN PLANNING, PTS 1-4, 2013, 671-674 : 991 - +
  • [32] Experimental Investigation into Aerodynamic Stability of Narrow Steel Truss Girder Suspension Bridge
    Bai, Hua
    Li, Jiawu
    ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 938 - 941
  • [33] Jindong Bridge: Suspension Bridge with Steel Truss Girder and Prefabricated RC Deck Slabs in China
    Zhang, Wenming
    Liu, Zhao
    Xu, Song
    STRUCTURAL ENGINEERING INTERNATIONAL, 2019, 29 (02) : 315 - 318
  • [34] Equivalent design of aeroelastic model for a long-span suspension bridge with truss stiffening girder
    Li, Chun-Guang
    Chen, Zheng-Qing
    Zhang, Zhi-Tian
    Zhendong yu Chongji/Journal of Vibration and Shock, 2009, 28 (09): : 171 - 174
  • [35] MECHANISM OF AERODYNAMIC STABILIZATION FOR LONG-SPAN SUSPENSION BRIDGE WITH STIFFENING TRUSS-GIRDER
    UEDA, T
    YASUDA, M
    NAKAGAKI, R
    JOURNAL OF WIND ENGINEERING AND INDUSTRIAL AERODYNAMICS, 1990, 33 (1-2) : 333 - 340
  • [36] Mechanical Characteristics Analysis of Sensitive Parameters of Long-span Steel Truss Suspension Bridge
    Wang Da
    Zhu Yi-zhou
    ADVANCED BUILDING MATERIALS, PTS 1-4, 2011, 250-253 (1-4): : 3381 - 3386
  • [37] Assessment & Analysis of Service Performance for Small-Span Suspension Bridge with Steel Truss Girders
    Sun, Hao
    Qian, Yongjiu
    Zhang, Fang
    SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 2187 - +
  • [38] Tensile Stress Modification for Cast-in-Situ Deck Slabs of Long-Span Steel Truss Girder Suspension Bridge
    Tang M.-L.
    Li C.
    Tao Q.-Y.
    Wang K.
    Bridge Construction, 2023, 53 (03) : 127 - 134
  • [39] Field Measurements of Wind Parameters and Correction of Wind Angle of Attack at Π-shaped Stiffening Girder Level of Large-span Suspension Bridge
    Liu Z.
    Wei Z.
    He F.
    Liu S.
    Wan T.
    Chen Z.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (11): : 1 - 13
  • [40] CONNECTION METHOD AND FATIGUE OF STRINGER TO CROSSBEAM OF LARGE-SPAN STEEL BRIDGES
    Yi, Lunxiong
    Zhang, Yezhi