Assessment & Analysis of Service Performance for Small-Span Suspension Bridge with Steel Truss Girders

被引:0
|
作者
Sun, Hao [1 ]
Qian, Yongjiu [2 ]
Zhang, Fang [2 ]
机构
[1] Changan Univ, Sch Highway, Xian 710064, Peoples R China
[2] Southwest Jiatong Univ, Sch Civil Engn, Chengdu 610031, Peoples R China
关键词
bridge engineering; suspension bridge; steel truss girder; static load test; assessment; strengthening;
D O I
10.4028/www.scientific.net/AMM.178-181.2187
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Most of the short span suspension bridges with steel truss girders early constructed will approach their design service life. Correctly evaluating the actual service performance is the basic basis of repairing, strengthening and technical reconstruction. First, load-bearing capacity evaluation based on static load test was briefly introduced. Then, combined with Chengnan bridge, the main existing damages and their causations of the bridge were summarized and analyzed. Based on the field detection datum and original design load grade, the finite element mode with some damages was established. Then, by analyzing the calculation results, the scheme of static load test was confirmed. Through comparing the static load test results with the results of upgraded finite element, the actual conditions of the existing bridge structure were evaluated. In order to resume its load-bearing capacity, some of measurements and suggestions of strengthening were proposed.
引用
收藏
页码:2187 / +
页数:2
相关论文
共 50 条
  • [1] Mechanical performance study and parametric analysis of three-tower four-span suspension bridges with steel truss girders
    Cheng, Jin
    Xu, Mingsai
    Xu, Hang
    STEEL AND COMPOSITE STRUCTURES, 2019, 32 (02): : 189 - 198
  • [2] Fracture performance assessment of service safety for the aging steel truss bridge
    Chen, H.
    Gao, R.
    Jiang, L. C.
    ISISS '2007: PROCEEDINGS OF THE INNOVATION AND SUSTAINABILITY OF STRUCTURES, VOLS 1 AND 2, 2008, : 345 - 351
  • [3] Analysis on temporary connection mode of the large-span steel truss girder suspension bridge
    Zhang, Haishun
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2020, 53 (12): : 98 - 105
  • [4] Mechanical Characteristics Analysis of Sensitive Parameters of Long-span Steel Truss Suspension Bridge
    Wang Da
    Zhu Yi-zhou
    ADVANCED BUILDING MATERIALS, PTS 1-4, 2011, 250-253 (1-4): : 3381 - 3386
  • [5] Mechanical performance analysis and parametric study of double-deck plate-truss composite steel girders of a three-tower four-span suspension bridge
    Cheng, Jin
    Xu, Mingsai
    Xu, Hang
    ENGINEERING STRUCTURES, 2019, 199
  • [6] Fatigue Analysis of Steel Box Stiffening Girders for Large-span Suspension Bridge in its Lifetime
    Zeng, Y.
    Tan, H.
    Li, X.
    Xiang, Z.
    Yu, F.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT, RESILIENCE AND SUSTAINABILITY, 2012, : 1173 - 1177
  • [7] Establishment and visualization of wind-vehicle-bridge analysis system for the large-span steel truss suspension bridge
    Han, Wanshui
    Liu, Huanju
    Bao, Dahai
    Huang, Pingming
    Yuan, Yangguang
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2018, 51 (03): : 99 - 108
  • [8] Dynamics of the small-span railway bridge under moving loads
    Szafranski, Marek
    64THSCIENTIFIC CONFERENCE OF THE COMMITTEE FOR CIVIL ENGINEERING OF THE POLISH ACADEMY OF SCIENCES AND THE SCIENCE COMMITTEE OF THE POLISH ASSOCIATION OF CIVIL ENGINEERS (PZITB) (KRYNICA 2018), 2019, 262
  • [9] Dynamic performance analysis of steel truss bridge
    Wang, Shanshan
    Xu, Tao
    Qin, Sifeng
    Zhang, Yunjie
    APPLIED MATERIALS AND TECHNOLOGIES FOR MODERN MANUFACTURING, PTS 1-4, 2013, 423-426 : 1548 - 1551
  • [10] Buffeting Time-Domain Analysis of Long-Span and Slender Suspension Bridge with a Steel Truss Stiffened Girder
    Jiang, Xiujuan
    Wu, Junyan
    Liu, Jianxin
    SUSTAINABLE ENVIRONMENT AND TRANSPORTATION, PTS 1-4, 2012, 178-181 : 2183 - +