Two-stage Adaptive Robust Optimal Scheduling Based on the Interval Probability Uncertainty Set for Microgrids

被引:0
|
作者
Wang, Can [1 ]
Zhang, Xuefei [2 ]
Ling, Kai [3 ]
Xi, Lei [1 ]
Chen, Ran [4 ]
Wang, Aoqi [1 ]
Chu, Sihu [1 ]
Tian, Fuyin [1 ]
Li, Xinran [1 ]
机构
[1] School of Electrical Engineering and New Energy, China Three Gorges University, Hubei Province, Yichang,443002, China
[2] Hubei Provincial Key Laboratory for Operation and Control of Cascaded Hydropower Station, China Three Gorges University, Hubei Province, Yichang,443002, China
[3] State Grid Quzhou Power Supply Company, Zhejiang Province, Quzhou,324000, China
[4] State Grid Hubei Economic Research Institute, Hubei Province, Wuhan,430077, China
关键词
Decision making;
D O I
暂无
中图分类号
学科分类号
摘要
The randomness of photovoltaic output and the fluctuation of load consumption have a significant impact on the optimal scheduling of microgrids. To this end, a strategic framework of integrated prediction-regulation-decision-making is proposed. Based on Gaussian process regression (GPR), an adaptive robust optimal scheduling model based on the interval probabilistic uncertain sets is established by combining the confidence interval generated adaptively from the historical data of typical days of photovoltaic output and load power consumption with the construction of uncertain sets in robust optimization. First, the fixed term of the uncertain set in the adaptive robust optimal scheduling model is generated by GPR. Then, the fluctuation term in the set is determined by adjusting the risk level considered by the decision-making link, thereby determining the boundary of the uncertain set under different scheduling conservatism. Next, the quality evaluation index of the prediction interval is used to assess the quality of each interval corresponding to each uncertain set. Finally, the test results on the modified IEEE 37-bus microgrid system verifies that the proposed model can effectively resist the fluctuation of photovoltaic output and load power consumption while maintaining low operating costs. © 2024 Chin.Soc.for Elec.Eng.
引用
收藏
页码:1750 / 1763
相关论文
共 50 条
  • [41] Two-Stage Optimal Scheduling of Electric Vehicle Charging Based on Transactive Control
    Liu, Zhaoxi
    Wu, Qiuwei
    Ma, Kang
    Shahidehpour, Mohammad
    Xue, Yusheng
    Huang, Shaojun
    IEEE TRANSACTIONS ON SMART GRID, 2019, 10 (03) : 2948 - 2958
  • [42] Adjustable robust optimization approach for two-stage operation of energy hub-based microgrids
    Shams, Mohammad H.
    Shahabi, Majid
    MansourLakouraj, Mohammad
    Shafie-khah, Miadreza
    Catalao, Joao P. S.
    ENERGY, 2021, 222 (222)
  • [43] Reliability-Centered Maintenance Scheduling Considering Failure Rates Uncertainty: A Two-Stage Robust Model
    Alizadeh, Ali
    Fereidunian, Alireza
    Moghimi, Mojtaba
    Lesani, Hamid
    IEEE TRANSACTIONS ON POWER DELIVERY, 2022, 37 (03) : 1941 - 1951
  • [44] A two-stage robust optimization approach for steelmaking-continuous casting production scheduling under uncertainty
    Jiang S.-L.
    Wen Y.-M.
    Chen L.
    Cao L.-L.
    Peng G.-Z.
    Kongzhi yu Juece/Control and Decision, 2023, 38 (12): : 3516 - 3524
  • [45] Agricultural Multi-Water Source Allocation Model Based on Interval Two-Stage Stochastic Robust Programming under Uncertainty
    Fu, Qiang
    Li, Tianxiao
    Cui, Song
    Liu, Dong
    Lu, Xueping
    WATER RESOURCES MANAGEMENT, 2018, 32 (04) : 1261 - 1274
  • [46] A queuing-theory-based interval-fuzzy robust two-stage programming model for environmental management under uncertainty
    Sun, Y.
    Li, Y. P.
    Huang, G. H.
    ENGINEERING OPTIMIZATION, 2012, 44 (06) : 707 - 724
  • [47] Dynamic Robust Optimization Method Based on Two-Stage Evaluation and Its Application in Optimal Scheduling of Integrated Energy System
    Zhou, Bo
    Li, Erchao
    APPLIED SCIENCES-BASEL, 2024, 14 (12):
  • [48] Agricultural Multi-Water Source Allocation Model Based on Interval Two-Stage Stochastic Robust Programming under Uncertainty
    Qiang Fu
    Tianxiao Li
    Song Cui
    Dong Liu
    Xueping Lu
    Water Resources Management, 2018, 32 : 1261 - 1274
  • [49] Robust Scheduling for Resource Constraint Scheduling Problem by Two-stage GA and MMEDA
    Tian, Jing
    Murata, Tomohiro
    PROCEEDINGS 2016 5TH IIAI INTERNATIONAL CONGRESS ON ADVANCED APPLIED INFORMATICS IIAI-AAI 2016, 2016, : 1042 - 1047
  • [50] Two-Stage Robust Optimization Under Decision Dependent Uncertainty
    Yunfan Zhang
    Feng Liu
    Yifan Su
    Yue Chen
    Zhaojian Wang
    Jo?o P.S.Catal?o
    IEEE/CAA Journal of Automatica Sinica, 2022, 9 (07) : 1295 - 1306