Reliability-Centered Maintenance Scheduling Considering Failure Rates Uncertainty: A Two-Stage Robust Model

被引:18
|
作者
Alizadeh, Ali [1 ,2 ]
Fereidunian, Alireza [3 ]
Moghimi, Mojtaba [4 ,5 ]
Lesani, Hamid [2 ]
机构
[1] Laval Univ, Coll Sci & Technol, Dept ECE, Quebec City, PQ, Canada
[2] Univ Tehran, Coll Engn, Sch ECE, Tehran 113654563, Iran
[3] KN Toosi Univ Technol, Fac EE, Energy Smart Grid Lab, Tehran, Iran
[4] Griffith Univ, Sch Engn, Brisbane, Qld 4111, Australia
[5] Australian Energy Market Operator AEMO, Brisbane, Qld 4111, Australia
关键词
Maintenance engineering; Uncertainty; Power system reliability; Reliability; Stochastic processes; Mathematical model; Load modeling; Reliability-centered maintenance; failure rate uncertainty; robust optimization; RESILIENCE ENHANCEMENT; SYSTEM; OPTIMIZATION;
D O I
10.1109/TPWRD.2021.3101458
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Reliability-centered maintenance (RCM) as a subset of the reliability assessment problems, is a powerful tool for enhancing reliability, and subsequently achieving the customers' higher satisfaction. However, deterministic RCM models could scarcely guarantee global optimality and feasibility of their solutions with real-world uncertain failure rates. In this paper, a robust model is proposed to consider the impact of failure rate uncertainty in the RCM scheduling problem, followed by a two-stage robust model development. The two-stage robust model is solved using Benders decomposition (BD) and outer approximation (OA) algorithms. The proposed model and solution method are applied to both educational RBTS2 system and real-size Finnish Distribution System, followed by demonstration of a higher financial and reliability performance, compared to that of the deterministic model. Sensitivities of the costs, available budget, uncertainty interval and computational time are analyzed and discussed, to conclude the paper.
引用
收藏
页码:1941 / 1951
页数:11
相关论文
共 50 条
  • [1] Reliability-Centered Maintenance Scheduling of Photovoltaic Components According to Failure Effects
    Shin, Joong-Woo
    Yoon, Kwang-Hoon
    Chai, Hui-Seok
    Kim, Jae-Chul
    ENERGIES, 2022, 15 (07)
  • [2] Study and application of Reliability-centered Maintenance considering Radical Maintenance
    Li, Dacheng
    Gao, Jinji
    JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2010, 23 (05) : 622 - 629
  • [3] Two-stage Robust Optimal Scheduling Model for Multi-energy Systems Considering Thermal Inertia Uncertainty
    Sun P.
    Teng Y.
    Hui Q.
    Chen Z.
    Zhongguo Dianji Gongcheng Xuebao/Proceedings of the Chinese Society of Electrical Engineering, 2021, 41 (21): : 7249 - 7260
  • [4] Modified Two-Stage Degradation Model for Dynamic Maintenance Threshold Calculation Considering Uncertainty
    Sun, Jiwen
    Li, Lin
    Xi, Lifeng
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2012, 9 (01) : 209 - 212
  • [5] A new model for reliability-centered maintenance prioritisation of distribution feeders
    Afzali, Peyman
    Keynia, Farshid
    Rashidinejad, Masoud
    ENERGY, 2019, 171 : 701 - 709
  • [6] Reliability-centered predictive maintenance scheduling for a continuously monitored system subject to degradation
    Zhou, Xiaojun
    Xi, Lifeng
    Lee, Jay
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2007, 92 (04) : 530 - 534
  • [7] Two-stage stochastic robust optimal scheduling of virtual power plant considering source load uncertainty
    Zhang, Xiaohui
    Liu, Yufei
    ENGINEERING REPORTS, 2024,
  • [8] A three-stage optimization model for scheduling facility maintenance considering random failure rates
    Zagia, F.
    Sedeh, O. Motamedi
    Ostadi, B.
    SCIENTIA IRANICA, 2023, 30 (05) : 1898 - 1909
  • [9] Two-stage robust optimisation for surgery scheduling considering surgeon collaboration
    Wang, Jin
    Guo, Hainan
    Tsui, Kwok-Leung
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2021, 59 (21) : 6437 - 6450
  • [10] Two-Stage robust optimization problems with two-stage uncertainty
    Goerigk, Marc
    Lendl, Stefan
    Wulf, Lasse
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 302 (01) : 62 - 78