Two-stage Adaptive Robust Optimal Scheduling Based on the Interval Probability Uncertainty Set for Microgrids

被引:0
|
作者
Wang, Can [1 ]
Zhang, Xuefei [2 ]
Ling, Kai [3 ]
Xi, Lei [1 ]
Chen, Ran [4 ]
Wang, Aoqi [1 ]
Chu, Sihu [1 ]
Tian, Fuyin [1 ]
Li, Xinran [1 ]
机构
[1] School of Electrical Engineering and New Energy, China Three Gorges University, Hubei Province, Yichang,443002, China
[2] Hubei Provincial Key Laboratory for Operation and Control of Cascaded Hydropower Station, China Three Gorges University, Hubei Province, Yichang,443002, China
[3] State Grid Quzhou Power Supply Company, Zhejiang Province, Quzhou,324000, China
[4] State Grid Hubei Economic Research Institute, Hubei Province, Wuhan,430077, China
关键词
Decision making;
D O I
暂无
中图分类号
学科分类号
摘要
The randomness of photovoltaic output and the fluctuation of load consumption have a significant impact on the optimal scheduling of microgrids. To this end, a strategic framework of integrated prediction-regulation-decision-making is proposed. Based on Gaussian process regression (GPR), an adaptive robust optimal scheduling model based on the interval probabilistic uncertain sets is established by combining the confidence interval generated adaptively from the historical data of typical days of photovoltaic output and load power consumption with the construction of uncertain sets in robust optimization. First, the fixed term of the uncertain set in the adaptive robust optimal scheduling model is generated by GPR. Then, the fluctuation term in the set is determined by adjusting the risk level considered by the decision-making link, thereby determining the boundary of the uncertain set under different scheduling conservatism. Next, the quality evaluation index of the prediction interval is used to assess the quality of each interval corresponding to each uncertain set. Finally, the test results on the modified IEEE 37-bus microgrid system verifies that the proposed model can effectively resist the fluctuation of photovoltaic output and load power consumption while maintaining low operating costs. © 2024 Chin.Soc.for Elec.Eng.
引用
收藏
页码:1750 / 1763
相关论文
共 50 条
  • [21] A two-stage optimal scheduling method for active distribution networks considering uncertainty risk
    Ma, Hengrui
    Liu, Zhe
    Li, Min
    Wang, Bo
    Si, Yang
    Yang, Yan
    Mohamed, Mohamed A.
    ENERGY REPORTS, 2021, 7 : 4633 - 4641
  • [22] Two-stage stochastic/robust scheduling based on permutable operation groups
    Louis Riviere
    Christian Artigues
    Hélène Fargier
    Annals of Operations Research, 2024, 332 : 645 - 687
  • [23] Two-stage stochastic/robust scheduling based on permutable operation groups
    Riviere, Louis
    Artigues, Christian
    Fargier, Helene
    ANNALS OF OPERATIONS RESEARCH, 2024, 332 (1-3) : 645 - 687
  • [24] A two-stage energy management framework for optimal scheduling of multi-microgrids with generation and demand forecasting
    Behzad Ashtari
    Mohsen Alizadeh Bidgoli
    Mojtaba Babaei
    Amir Ahmarinejad
    Neural Computing and Applications, 2022, 34 : 12159 - 12173
  • [25] A two-stage energy management framework for optimal scheduling of multi-microgrids with generation and demand forecasting
    Ashtari, Behzad
    Bidgoli, Mohsen Alizadeh
    Babaei, Mojtaba
    Ahmarinejad, Amir
    NEURAL COMPUTING & APPLICATIONS, 2022, 34 (14): : 12159 - 12173
  • [26] A Two-stage Optimal Generation Units Dispatch for Standalone Microgrids
    Shoeb, Md Asaduzzaman
    Shahnia, Farhad
    Shafiullah, G. M.
    2019 9TH INTERNATIONAL CONFERENCE ON POWER AND ENERGY SYSTEMS (ICPES), 2019,
  • [27] Optimal Water Resources Planning Based on Interval-parameter Two-stage Robust Stochastic Programming Model
    Chen H.
    Wang Q.
    Li X.
    Wang Z.
    Li C.
    Nongye Jixie Xuebao/Transactions of the Chinese Society for Agricultural Machinery, 2019, 50 (03): : 271 - 280
  • [28] Robust Optimal Scheduling with Interruptible Load Based on N-x Uncertainty Set
    Zhu L.
    Ji X.
    Tang L.
    Yang Q.
    Niu P.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2020, 44 (17): : 34 - 42
  • [29] Two-stage robust optimization of thermal-ESS units scheduling under wind uncertainty
    Wang, Jun
    Xu, Xiao
    Li, Hongyan
    Chen, Hongmei
    ENERGY REPORTS, 2022, 8 : 1147 - 1155
  • [30] A Two-Stage Robust Transmission Expansion Planning Approach with Multi-Band Uncertainty Set
    Dai, Chenxi
    Wu, Lei
    2016 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PESGM), 2016,