Bi-Objective Job-Shop Scheduling Considering Human Fatigue in Cobotic Order Picking Systems: A Case of an Online Grocer

被引:1
|
作者
Vermin, Berry Lance [1 ,2 ]
Abbink, David [1 ]
Schulte, Frederik [2 ]
机构
[1] Delft Univ Technol, Dept Cognit Robot, Mekelweg 2, NL-2628 CD Delft, Netherlands
[2] Dept Maritime & Transport Technol, Mekelweg 2, NL-2628 CD Delft, Netherlands
关键词
Order Picking; Job-Shop Scheduling Problem; Human Factors; Mixed-Integer Nonlinear Programming; Occupational Fatigue; Cobotic Order Picking; ASSIGNMENT; MODEL;
D O I
10.1016/j.procs.2024.01.063
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Increasing online retail has resulted in increased automation in order picking systems, leading to new challenges and opportunities in task scheduling. The job-shop scheduling problem is an optimization problem essential in such systems, but existing JSP literature often overlooks workplace fatigue, which harms employees' well-being and costs U.S. employers up to 127 billion annually. In this work, we propose fatigue consideration in the job-shop scheduling problem in a cobotic order picking system to mitigate its negative effects. We present a new bi-objective mixed integer nonlinear programming problem formulation that considers worker fatigue and productivity during schedule optimisation. To put the results of simulated optimisation in perspective, we experimentally validate the fatigue model and scheduling results in a real operation. The mathematical model finds solutions that conventional single-objective optimisation cannot, allowing fractional fatigue distribution improvements more than 4x larger than the decrease in productivity they require in 53% of the considered virtual cases. The experiments show that our predictive fatigue model has an average RMSE of 2.20 kcal/min in estimating energy expenditure rates compared to heart rate measurements. It also shows a low correlation, meaning it is unfit for application. On the other hand, fatigue-conscious schedules show no clear benefit regarding measured and perceived fatigue. However, the scheduling model could also use heart rate measurements that do not show these inaccuracies. Our study highlights the need to further develop and validate the mathematical formulation and fatigue model and extend to other human factors and indirect fatigue effects. (C) 2024 The Authors. Published by Elsevier B.V.
引用
收藏
页码:635 / 644
页数:10
相关论文
共 50 条
  • [31] A new hybrid multi-objective Pareto archive PSO algorithm for a bi-objective job shop scheduling problem
    Tavakkoli-Moghaddam, R.
    Azarkish, M.
    Sadeghnejad-Barkousaraie, A.
    EXPERT SYSTEMS WITH APPLICATIONS, 2011, 38 (09) : 10812 - 10821
  • [32] A Bi-objective Model for Dual-resource Constrained Job Shop Scheduling with the Consideration of Energy Consumption
    Zheng, Feifeng
    Sui, Yang
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 118 - 123
  • [33] Decoder-based Evolutionary Algorithm for bi-objective Just-in-Time Single-Machine Job-shop
    Jacquin, Sophie
    Allart, Emilie
    Dufosse, Fanny
    Jourdan, Laetitia
    PROCEEDINGS OF 2016 IEEE SYMPOSIUM SERIES ON COMPUTATIONAL INTELLIGENCE (SSCI), 2016,
  • [34] RESEARCH ON THE MULTI-OBJECTIVE OPTIMIZED SCHEDULING OF THE FLEXIBLE JOB-SHOP CONSIDERING MULTI-RESOURCE ALLOCATION
    Zhong, Y.
    Li, J. M.
    Zhu, S. Z.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2017, 16 (03) : 517 - 526
  • [35] Bi-level multi-objective mathematical model for job-shop scheduling: the application of Theory of Constraints
    Kasemset, Chompoonoot
    Kachitvichyanukul, Voratas
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2010, 48 (20) : 6137 - 6154
  • [36] Swarm intelligent based metaheuristics for a bi-objective flexible job shop integrated supply chain scheduling problems
    Mahmud, Shahed
    Chakrabortty, Ripon K.
    Abbasi, Alireza
    Ryan, Michael J.
    Applied Soft Computing, 2022, 121
  • [37] Performance Comparison of NSGA-II and NSGA-III on Bi-objective Job Shop Scheduling Problems
    dos Santos, Francisco
    Costa, Lino A.
    Varela, Leonilde
    OPTIMIZATION, LEARNING ALGORITHMS AND APPLICATIONS, PT I, OL2A 2023, 2024, 1981 : 531 - 543
  • [38] Swarm intelligent based metaheuristics for a bi-objective flexible job shop integrated supply chain scheduling problems
    Mahmud, Shahed
    Chakrabortty, Ripon K.
    Abbasi, Alireza
    Ryan, Michael J.
    APPLIED SOFT COMPUTING, 2022, 121
  • [39] Energy Conscious Bi-objective Job Shop Scheduling: A New Formulation and Augmented e-Constraint Method
    Bouzegag, S. Hocine
    Kesen, Saadettin Erhan
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS-PRODUCTION MANAGEMENT SYSTEMS FOR VOLATILE, UNCERTAIN, COMPLEX, AND AMBIGUOUS ENVIRONMENTS, APMS 2024, PT VI, 2024, 733 : 213 - 228
  • [40] Bi-objective partial flexible job shop scheduling problem: NSGA-II, NRGA, MOGA and PAES approaches
    Rabiee, M.
    Zandieh, M.
    Ramezani, P.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (24) : 7327 - 7342