Bi-level multi-objective mathematical model for job-shop scheduling: the application of Theory of Constraints

被引:21
|
作者
Kasemset, Chompoonoot [1 ]
Kachitvichyanukul, Voratas [1 ]
机构
[1] Asian Inst Technol, Pathum Thani, Thailand
关键词
Theory of Constraints (TOC); job-shop scheduling; bi-level mathematical model; multi-objective; bottlenecks; MACHINE; TOC; PERFORMANCE;
D O I
10.1080/00207540903176705
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study highlights a different systematic approach to the application of Theory of Constraints (TOC). The work describes the decisions involved in the implementation of TOC in a job-shop environment as a bi-level multi-objective mathematical model. On the first level, the decision is made by minimising idle time on the bottleneck to generate the initial schedule. The second level decision is to improve additional performance measurements by applying the multi-objective technique, while maintaining the bottleneck sequence obtained from the first level decision. Moreover, the concept of transfer lot is also adopted in this model to reduce the waiting time on each machine by allowing overlapped operations. The concept of transfer lot is applied as the constraint on earliest starting time for each job on each machine in the proposed mathematical model. Additionally, the machine set up time and product demands are also adopted to make the model practical to use in the real situation. The numerical examples for both single and multiple bottleneck cases are given to demonstrate how this approach works. The commercially available optimiser, the LINGO 10 software package, is used to solve the examples and the result shows how this approach works in practice.
引用
下载
收藏
页码:6137 / 6154
页数:18
相关论文
共 50 条
  • [1] Application of multi-objective memetic algorithm in multi-objective flexible job-shop scheduling problem
    Zhenwen, H.U.
    Academic Journal of Manufacturing Engineering, 2019, 17 (03): : 24 - 28
  • [2] A multi-objective PSO for job-shop scheduling problems
    Sha, D. Y.
    Lin, Hsing-Hung
    EXPERT SYSTEMS WITH APPLICATIONS, 2010, 37 (02) : 1065 - 1070
  • [3] A Multi-objective PSO for Job-shop Scheduling Problems
    Sha, D. Y.
    Lin, H. H.
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 489 - +
  • [4] Application of Adaptive Particle Swarm Optimization to Bi-level Job-Shop Scheduling Problem
    Kasemset, Chompoonoot
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2014, 13 (01): : 43 - 51
  • [5] A Multi-objective Memetic Algorithm for the Job-Shop Scheduling Problem
    Frutos, Mariano
    Tohme, Fernando
    OPERATIONAL RESEARCH, 2013, 13 (02) : 233 - 250
  • [6] An effective memetic algorithm for multi-objective job-shop scheduling
    Gong, Guiliang
    Deng, Qianwang
    Chiong, Raymond
    Gong, Xuran
    Huang, Hezhiyuan
    KNOWLEDGE-BASED SYSTEMS, 2019, 182
  • [7] A Multi-objective Memetic Algorithm for the Job-Shop Scheduling Problem
    Mariano Frutos
    Fernando Tohmé
    Operational Research, 2013, 13 : 233 - 250
  • [8] Approach of hybrid GA for multi-objective job-shop scheduling
    Meng, Qiaofeng
    Zhang, Linxuan
    Fan, Yushun
    INTERNATIONAL JOURNAL OF MODELING SIMULATION AND SCIENTIFIC COMPUTING, 2016, 7 (04)
  • [9] A MULTI-OBJECTIVE FLEXIBLE JOB-SHOP SCHEDULING MODEL BASED ON FUZZY THEORY AND IMMUNE GENETIC ALGORITHM
    Shi, D. L.
    Zhang, B. B.
    Li, Y.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2020, 19 (01) : 123 - 133
  • [10] A FUZZY MATHEMATICAL MODEL FOR MULTI-OBJECTIVE FLEXIBLE JOB-SHOP SCHEDULING PROBLEM WITH NEW JOB INSERTION AND EARLINESS/TARDINESS PENALTY
    Seyyedi, Mir Hossein
    Saghih, Amir Mohammad Fakoor
    Azimi, Zahra Naji
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2021, 28 (03): : 256 - 276