Bi-level multi-objective mathematical model for job-shop scheduling: the application of Theory of Constraints

被引:21
|
作者
Kasemset, Chompoonoot [1 ]
Kachitvichyanukul, Voratas [1 ]
机构
[1] Asian Inst Technol, Pathum Thani, Thailand
关键词
Theory of Constraints (TOC); job-shop scheduling; bi-level mathematical model; multi-objective; bottlenecks; MACHINE; TOC; PERFORMANCE;
D O I
10.1080/00207540903176705
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study highlights a different systematic approach to the application of Theory of Constraints (TOC). The work describes the decisions involved in the implementation of TOC in a job-shop environment as a bi-level multi-objective mathematical model. On the first level, the decision is made by minimising idle time on the bottleneck to generate the initial schedule. The second level decision is to improve additional performance measurements by applying the multi-objective technique, while maintaining the bottleneck sequence obtained from the first level decision. Moreover, the concept of transfer lot is also adopted in this model to reduce the waiting time on each machine by allowing overlapped operations. The concept of transfer lot is applied as the constraint on earliest starting time for each job on each machine in the proposed mathematical model. Additionally, the machine set up time and product demands are also adopted to make the model practical to use in the real situation. The numerical examples for both single and multiple bottleneck cases are given to demonstrate how this approach works. The commercially available optimiser, the LINGO 10 software package, is used to solve the examples and the result shows how this approach works in practice.
引用
下载
收藏
页码:6137 / 6154
页数:18
相关论文
共 50 条
  • [41] Study on Multi-objective Flexible Job-shop Scheduling Problem considering Energy Consumption
    Jiang, Zengqiang
    Zuo, Le
    Mingcheng E
    JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2014, 7 (03): : 589 - 604
  • [42] A simple two-agent system for multi-objective flexible job-shop scheduling
    Yingli Li
    Jiahai Wang
    Zhengwei Liu
    Journal of Combinatorial Optimization, 2022, 43 : 42 - 64
  • [43] A simple two-agent system for multi-objective flexible job-shop scheduling
    Li, Yingli
    Wang, Jiahai
    Liu, Zhengwei
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2022, 43 (01) : 42 - 64
  • [44] An object-oriented approach for multi-objective flexible job-shop scheduling problem
    Kaplanoglu, Vahit
    EXPERT SYSTEMS WITH APPLICATIONS, 2016, 45 : 71 - 84
  • [45] Hybrid Multi-Objective PSO with Solution Diversity Fxtraction for Job-Shop Scheduling Management
    Cheng, Hsiang-Chun
    Lu, Chun-Liang
    Chiu, Shih-Yuan
    2012 6TH INTERNATIONAL CONFERENCE ON NEW TRENDS IN INFORMATION SCIENCE, SERVICE SCIENCE AND DATA MINING (ISSDM2012), 2012, : 711 - 716
  • [46] Improved NSGA-II for the multi-objective flexible job-shop scheduling problem
    Zhang C.
    Dong X.
    Wang X.
    Li X.
    Liu Q.
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2010, 46 (11): : 156 - 164
  • [47] Research on Multi-objective Fuzzy Flexible Job-Shop Scheduling Based on Cloud Computinger
    Xuan, Jiao
    Li Chengyang
    Jiang, Xiuyan
    2020 IEEE 8TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT), 2020, : 7 - 10
  • [48] Multi-objective evolutionary job-shop scheduling using jumping genes genetic algorithm
    Ripon, Kazi Shah Nawaz
    Tsang, Chi-Ho
    Kwong, Sam
    2006 IEEE INTERNATIONAL JOINT CONFERENCE ON NEURAL NETWORK PROCEEDINGS, VOLS 1-10, 2006, : 3100 - +
  • [49] Promoting Green and Sustainability: A Multi-Objective Optimization Method for the Job-Shop Scheduling Problem
    Liao, Wenzhu
    Wang, Tong
    SUSTAINABILITY, 2018, 10 (11)
  • [50] A Hybrid Differential Evolution Algorithm for the Multi-objective Reentrant Job-shop Scheduling Problem
    Qian, B.
    Li, Z. H.
    Hu, R.
    Zhang, C. S.
    2013 10TH IEEE INTERNATIONAL CONFERENCE ON CONTROL AND AUTOMATION (ICCA), 2013, : 485 - 489