Energy Conscious Bi-objective Job Shop Scheduling: A New Formulation and Augmented e-Constraint Method

被引:0
|
作者
Bouzegag, S. Hocine [1 ]
Kesen, Saadettin Erhan [1 ]
机构
[1] Konya Tech Univ, Fac Engn & Nat Sci, Dept Ind Engn, Selcuklu, Konya, Turkiye
关键词
Multi-Objective Optimization; Job Shop Scheduling; Sustainability; Switch on/off; Augmecon Method; MULTIOBJECTIVE GENETIC ALGORITHM; EFFICIENCY;
D O I
10.1007/978-3-031-71645-4_15
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper addresses a job shop scheduling problem in which machines can operate at varying speeds and different energy efficient strategies known as speed scaling and switching on/off are incorporated as well. When a machine runs at high-speed, the amount of time to complete the job shortens but energy consumed by the machine increases. Selection of different speed modes of machines for different jobs (i.e. speed scaling) generates compromise solutions. To save energy further, one must decide whether to shut down the machine during idle periods of consecutive jobs. One option is to turn off the machine whenever the idle period occurs regardless of its duration, which may result in machine breakdown due to excessive opening and closing. Alternatively, a threshold or time limit can be determined below which the machine is kept in standby mode by consuming very little energy. We aim to minimize two conflicting objectives, energy consumption resulting from usage while the machine runs at a particular speed or in standby state and total tardiness emanating from late completions. To this end, we developed a MILP formulation for the problem and Augmented epsilon-Constraint (Augmecon) method is implemented to find pareto optimal solutions. The experimental result reveals that energy consumption and total tardiness objectives are conflicting. Based on payoff table, while the total energy consumed is 25000, total tardiness is 270. When energy consumption increases to 32186, total tardiness reduces to 36. Between the two, Augmented epsilon-Constraint (Augmecon) method provides non-dominated optimal solutions based on 11 grid points.
引用
收藏
页码:213 / 228
页数:16
相关论文
共 50 条
  • [1] Bi-objective job shop scheduling with outsourcing options
    Guo, Xiuping
    Lei, Deming
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (13) : 3832 - 3841
  • [2] A Hybrid Nested Partitions Method for Bi-objective Job Shop Scheduling Problem Considering Energy Consumption and Makespan
    Dai, Mei
    Li, Xin
    Mao, Limin
    ADVANCED MANUFACTURING AND AUTOMATION VII, 2018, 451 : 563 - 571
  • [3] Bi-objective Flexible Job Shop Scheduling with Operation Overlapping Costs
    Zheng, Feifeng
    Wang, Zhaojie
    IFAC PAPERSONLINE, 2019, 52 (13): : 893 - 898
  • [4] RNN Modelling for Bi-objective MPM Job Shop Scheduling Problem
    Tselios, Dimitrios
    Savvas, Ilias
    Kechadi, M-Tahar
    2013 FIFTH INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE, COMMUNICATION SYSTEMS AND NETWORKS (CICSYN), 2013, : 13 - 18
  • [5] A bi-objective scheduling optimization of job shop (ID: 6-055)
    Liu Xiaoxia
    Xie Liyang
    Cui Jingwei
    PROCEEDINGS OF THE 13TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-5: INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION IN NEW-ERA, 2006, : 2417 - 2420
  • [6] A clustering search metaheuristic for the bi-objective flexible job shop scheduling problem
    Altoe, Wagner A. S.
    Bissoli, Dayan de C.
    Mauri, Geraldo R.
    Amaral, Andre R. S.
    2018 XLIV LATIN AMERICAN COMPUTER CONFERENCE (CLEI 2018), 2018, : 158 - 166
  • [7] A bi-objective model for job-shop scheduling problem to minimize both energy consumption and makespan
    Yan He
    Fei Liu
    Hua-jun Cao
    Cong-bo Li
    Journal of Central South University of Technology, 2005, 12 : 167 - 171
  • [8] A bi-objective model for job-shop scheduling problem to minimize both energy consumption and makespan
    何彦
    刘飞
    曹华军
    李聪波
    Journal of Central South University, 2005, (S2) : 167 - 171
  • [9] A bi-objective model for job-shop scheduling problem to minimize both energy consumption and makespan
    He, Y
    Liu, F
    Cao, HJ
    Li, CB
    JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY, 2005, 12 (2): : 167 - 171
  • [10] A Bi-objective Model for Dual-resource Constrained Job Shop Scheduling with the Consideration of Energy Consumption
    Zheng, Feifeng
    Sui, Yang
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 118 - 123