Causes of Incomplete Risk Identification in Major Transportation Engineering and Construction Projects

被引:0
|
作者
Dicks, Evan P. [1 ]
Molenaar, Keith R. [1 ]
机构
[1] Univ Colorado, Dept Civil Environm & Architectural Engn, Boulder, CO 80309 USA
关键词
construction management; risk management; transportation planning policy and processes; risk identification; MANAGEMENT; DELIVERY; STATE;
D O I
10.1177/03611981241263565
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Risk management is a widely recognized best practice for project teams to enable successful delivery of major transportation projects. Whereas many risks are identified in workshops conducted during the design stage, other risks relevant to the project are either overlooked, missed, or underassessed, only to occur later in the project lifecycle. There is limited research examining the causes of incomplete risk identification, particularly as it relates to construction projects. Contributing factors of incomplete risk identification were examined through 12 interviews with risk management professionals based on their involvement with projects that experienced a risk that was unidentified or underassessed. The study identified 10 contributing factors through a thematic analysis of the interviews including cognitive biases, communication and alignment, facilitator expertise, imagination, experience, level of detail, management support, process standardization, stakeholder participation, and time constraints. The findings provide key insights into understanding why some but not all risks are identified, and serve as a foundation for improving the identification workshops of major transportation projects.
引用
收藏
页数:10
相关论文
共 50 条
  • [41] Identification of strategies for enhancing the risk resilience of construction projects as systems
    Sladowski, Grzegorz
    Sroka, Bartlomiej
    Szewczyk, Bartlomiej
    Barnas, Krzysztof
    AUTOMATION IN CONSTRUCTION, 2024, 166
  • [42] Research on the Risk Identification for the International Engineering Contracting EPC Projects
    Tang, Tang
    PROCEEDINGS OF THE 21ST INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT 2014, 2015, : 477 - 482
  • [43] CAUSES AND EFFECTS OF VARIATIONS ON CONSTRUCTION PROJECTS
    Jayawardena, Nishadi
    Ramachandra, Thanuja
    Rotimi, James
    SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : 483 - 488
  • [44] CAUSES OF DELAYS IN IRANIAN CONSTRUCTION PROJECTS
    Khoshgoftar, Mohammad
    Abu Bakar, Abu Hassan
    Osman, Omar
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2010, 10 (02) : 53 - 69
  • [45] Delays in construction projects - Causes and impacts
    Arantes, Amlcar
    da Silva, Pedro Fernandez
    Ferreira, Luis Miguel D. F.
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 1105 - 1110
  • [46] Causes of government construction projects' abandonment
    Damoah, Isaac Sakyi
    Ayakwa, Anthony
    Kumi, Desmond Kwadjo
    JOURNAL OF PROJECT MANAGEMENT, 2021, 6 (04) : 179 - 190
  • [47] Review of Delay Causes in Construction Projects
    AlGheth, Abdulhamid
    Sayuti, Md Ishak
    PROCEEDINGS OF AICCE'19: TRANSFORMING THE NATION FOR A SUSTAINABLE TOMORROW, 2020, 53 : 429 - 437
  • [48] Causes of delay in construction projects in Oman
    Umar, Tariq
    MIDDLE EAST JOURNAL OF MANAGEMENT, 2018, 5 (02) : 121 - 136
  • [49] CAUSES OF REWORK IN CONSTRUCTION PROJECTS IN UKRAINE
    Trach, R.
    Pawluk, K.
    Lendo-Siwicka, M.
    ARCHIVES OF CIVIL ENGINEERING, 2019, 65 (03) : 61 - 74
  • [50] Causes of Delay in Road Construction Projects
    Mahamid, Ibrahim
    Bruland, Amund
    Dmaidi, Nabil
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (03) : 300 - 310