Causes of Incomplete Risk Identification in Major Transportation Engineering and Construction Projects

被引:0
|
作者
Dicks, Evan P. [1 ]
Molenaar, Keith R. [1 ]
机构
[1] Univ Colorado, Dept Civil Environm & Architectural Engn, Boulder, CO 80309 USA
关键词
construction management; risk management; transportation planning policy and processes; risk identification; MANAGEMENT; DELIVERY; STATE;
D O I
10.1177/03611981241263565
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Risk management is a widely recognized best practice for project teams to enable successful delivery of major transportation projects. Whereas many risks are identified in workshops conducted during the design stage, other risks relevant to the project are either overlooked, missed, or underassessed, only to occur later in the project lifecycle. There is limited research examining the causes of incomplete risk identification, particularly as it relates to construction projects. Contributing factors of incomplete risk identification were examined through 12 interviews with risk management professionals based on their involvement with projects that experienced a risk that was unidentified or underassessed. The study identified 10 contributing factors through a thematic analysis of the interviews including cognitive biases, communication and alignment, facilitator expertise, imagination, experience, level of detail, management support, process standardization, stakeholder participation, and time constraints. The findings provide key insights into understanding why some but not all risks are identified, and serve as a foundation for improving the identification workshops of major transportation projects.
引用
收藏
页数:10
相关论文
共 50 条
  • [31] A Study of Risk Management for Construction Process of Tunnel Engineering Projects
    Hu, Hao
    Li, Jingjing
    Wang, Feng
    Zhang, Jun
    2010 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE AND ENGINEERING (MSE 2010), VOL 3, 2010, : 491 - 495
  • [32] ADOPTION OF SIMULATION TECHNIQUES FOR MASTERING LOGISTIC COMPLEXITY OF MAJOR CONSTRUCTION AND ENGINEERING PROJECTS
    Klingebiel, Katja
    Gavrylenko, Yuriy
    Wagenitz, Axel
    PROCEEDINGS OF THE 24TH EUROPEAN CONFERENCE ON MODELLING AND SIMULATION ECMS 2010, 2010, : 160 - +
  • [33] Exploring critical delivery selection risk factors for transportation design and construction projects
    Tran, Dai
    Molenaar, Keith
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2014, 21 (06) : 631 - +
  • [34] Identification of Contractual and Financial Dispute Causes in the Off-Site Construction Projects
    Yildiran, Merve Pelinsu
    Demirdogen, Gokhan
    BUILDINGS, 2024, 14 (08)
  • [35] Risk Analysis for Transportation Projects
    Franklin, Paul
    ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2009 PROCEEDINGS, 2009, : 275 - 279
  • [36] Risk identification framework in construction of Egyptian mega housing projects
    Nabawy, Mohamed
    Ofori, George
    Morcos, Maged
    Egbu, Charles
    AIN SHAMS ENGINEERING JOURNAL, 2021, 12 (02) : 2047 - 2056
  • [37] Schedule Performance of Construction Manager at Risk (CMAR) Delivery on Pipeline Engineering and Construction Projects
    Francom, Tober
    El Asmar, Mounir
    Ariaratnam, Samuel T.
    CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 569 - 578
  • [38] Risk identification on community-based construction projects in Zambia
    Manelele, I.
    Muya, M.
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2008, 6 (02) : 145 - 161
  • [39] Identification and analysing of risk factors affecting cost of construction projects
    Vivek, Attada
    Rao, C. H. Hanumantha
    MATERIALS TODAY-PROCEEDINGS, 2022, 60 : 1696 - 1701
  • [40] A Preliminary Study of the Subcontractor's Risk Identification for the construction projects
    Zaini, Afzan Ahmad
    Endut, Intan Rohani
    Shehu, Zayyana
    IEEE SYMPOSIUM ON BUSINESS, ENGINEERING AND INDUSTRIAL APPLICATIONS (ISBEIA 2012), 2012, : 878 - 883