Application of FMEA Technology in CCM Equipment Maintenance Optimization of CPR1000 Unit

被引:0
|
作者
Yang, Lifei [1 ]
Wu, Tao [1 ]
Qing, Chen [1 ]
Liu, Xiaolei [1 ]
Shi, Lei [1 ]
机构
[1] Suzhou Nuclear Power Research Institute, Suzhou,Jiangsu,215004, China
来源
关键词
Nuclear power plants;
D O I
10.13832/j.jnpe.2019.05.0175
中图分类号
学科分类号
摘要
In this paper, the failure mode and effect analysis (FMEA) method and process are introduced. Combined with the maintenance management characteristics of nuclear power plants, a simplified FMEA method is formed. The failure mode, fault impact and maintenance strategy of the critical component management (CCM) equipment in CPR1000 units are analyzed. The CCM equipment FMEA database is established. Practice has proved that the development of this work not only identifies the potential shutdown and shutdown failure modes that CCM equipment management has not covered, but also finds errors and inconsistencies in the CCM equipment technical documents, and also reviews the correctness and completeness of the CCM equipment list. At the same time, based on group operation and maintenance big data, the maintenance strategies of multiple CCM equipments are systematically optimized to make up for the lack of maintenance management of CCM equipment, reduce unnecessary investment in CCM equipment maintenance resources and manage equipment related to CCM equipment. It is of important reference value for the implementation of the management of CCM equipment and the mitigation of the risk of unplanned shutdown of nuclear power plants. © 2019, Editorial Board of Journal of Nuclear Power Engineering. All right reserved.
引用
收藏
页码:175 / 179
相关论文
共 37 条
  • [1] RADIOGRAPHY INSPECTION TECHNOLOGY OF CPR1000 NUCLEAR POWER UNIT PRESSURIZER
    Hao, Jingyun
    Deng, Dong
    Wang, Jing
    Wang, Shuangyin
    Hua, Xiongfei
    [J]. ENERGY MATERIALS CONFERENCE PROCEEDINGS 2014, 2014, : 539 - 544
  • [2] Optimization of Power Ramp Rate in CPR1000 Reactor Restarting
    Li, Changzheng
    Lin, Shaofang
    Liu, Weichao
    Cai, Zhiyi
    Nie, Lihong
    Deng, Yongjun
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2019, 40 (05): : 74 - 78
  • [3] Optimization of hydrogen mitigation systems in CPR1000 during a refueling outage
    Huang, Zhi'ao
    Miao, Huifang
    Zheng, Chenxi
    Li, Ning
    Shi, Xingwei
    Lei, Lei
    [J]. ANNALS OF NUCLEAR ENERGY, 2019, 129 : 253 - 263
  • [4] Simulation of advanced accumulator and its application in CPR1000 LBLOCA analysis
    Hu, Hongwei
    Shan, Jianqiang
    Gou, Junli
    Cao, Jianhua
    Shen, Yonggang
    Fu, Xiangang
    [J]. ANNALS OF NUCLEAR ENERGY, 2014, 69 : 183 - 195
  • [5] Optimization of CPR1000 Charging Pump Shaft Power and Hydraulic Performance Study
    Zhang, Qiangsheng
    Ma, Huiping
    Wang, Yan
    Shen, Wei
    Wu, Chao
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2019, 40 (03): : 134 - 137
  • [6] FMEA技术在CPR1000机组关键敏感设备维修优化中的应用
    杨立飞
    武涛
    青晨
    刘晓磊
    时雷
    [J]. 核动力工程, 2019, 40 (05) : 175 - 179
  • [7] Design and Study of Backup Cooling Mode for Spent Fuel Pool of CPR1000 Unit
    Zhɑnɡ, Guohui
    Song, Hehang
    Luo, Zhiping
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2021, 42 (05): : 240 - 244
  • [8] Primary coolant drainage level response analysis and optimization of CPR1000 units
    Chen, Yongwei
    You, Dailun
    Li, Dong
    Xie, Yongjing
    [J]. NUCLEAR ENGINEERING AND DESIGN, 2018, 327 : 1 - 6
  • [9] Optimal Control of Stretch-out Operation for CPR1000 Nuclear Power Unit
    Yang, Zhang
    Song, Yinlei
    Tian, Wei
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2022, 43 (03): : 144 - 150
  • [10] Research on experiment evaluation method for thermal ratchet of nuclear equipment at CPR1000 nuclear power station
    Wu, Shijian
    Jing, Ting
    Xiong, Guangming
    Liu, Le
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2014, 35 (05): : 94 - 96