Optimization of CPR1000 Charging Pump Shaft Power and Hydraulic Performance Study

被引:0
|
作者
Zhang, Qiangsheng [1 ]
Ma, Huiping [2 ]
Wang, Yan [1 ]
Shen, Wei [1 ]
Wu, Chao [2 ]
机构
[1] Nuclear and Radiation Safety Center, MEE, Beijing,100082, China
[2] Shanghai Apollo Machinery Co. Ltd., Shanghai,201401, China
来源
关键词
Pumps;
D O I
10.13832/j.jnpe.2019.03.0134
中图分类号
学科分类号
摘要
Based on the analysis of CPR1000 charging pump hydraulic performance test, it is found that the large inlet area of the diversion body is the main reason for the high shaft power. Every piece of steel plate was welded to the inlet tongue respectively to improve the hydraulic performance of the charging pump. Firstly, with the help of Ansys CFX, the flow field inside the charging pump of the modified scheme was numerically simulated and compared with the measured hydraulic performance data before the scheme modification. Then the hydraulic performance of the charging pump was tested and verified. The results show that the shaft power of the charging pump is controlled below 650 kW, meeting the requirements of the evaluation test program and technical specification, and the safety and reliability of the charging pump is improved. © 2019, Editorial Board of Journal of Nuclear Power Engineering. All right reserved.
引用
收藏
页码:134 / 137
相关论文
共 50 条
  • [1] Optimization of Power Ramp Rate in CPR1000 Reactor Restarting
    Li, Changzheng
    Lin, Shaofang
    Liu, Weichao
    Cai, Zhiyi
    Nie, Lihong
    Deng, Yongjun
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2019, 40 (05): : 74 - 78
  • [2] Transient analysis for CPR1000 reactor main pump and electromotor
    Xiao, San-Ping
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2013, 34 (03): : 152 - 155
  • [3] A STUDY OF POWER DECREASE STRATEGY ON CPR1000 FULL SCOPE SIMULATOR
    Zhang, Zhenhua
    Zhang, Bo
    Wang, Qingsong
    Wang, Chengzhi
    Xing, Dan
    [J]. PROCEEDINGS OF THE 25TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, 2017, VOL 1, 2017,
  • [4] Analysis of Fluctuation Characteristics of Power Range Detector for CPR1000
    He, Yang
    Zhang, Haizhou
    Cao, Yunlong
    Wang, Zongkui
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2019, 40 (06): : 30 - 34
  • [5] Implementation and Optimization Strategy of SG-CCTV Inspection of CPR1000 Nuclear Power Station
    Li, Tian
    Li, Cheng
    Chen, Yanhui
    Xue, Donglin
    [J]. 2020 6TH INTERNATIONAL CONFERENCE ON ENERGY, ENVIRONMENT AND MATERIALS SCIENCE, 2020, 585
  • [6] A study of RCS depressurization strategy of CPR1000 SAMG
    Yu, Peizhao
    Zheng, Jianxiang
    Li, Jun
    Miao, Huifang
    Wu, Ling
    Gu, Danying
    [J]. KERNTECHNIK, 2022, 87 (03) : 251 - 259
  • [7] Preliminary Study on Risk-informed LBLOCA of CPR1000 Nuclear Power Plant
    Song, Jianyang
    Yang, Jiang
    Liu, Jingquan
    Liu, Pingping
    Wang, Ting
    Liu, Yijun
    [J]. Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2018, 52 (06): : 1028 - 1033
  • [8] Optimization of hydrogen mitigation systems in CPR1000 during a refueling outage
    Huang, Zhi'ao
    Miao, Huifang
    Zheng, Chenxi
    Li, Ning
    Shi, Xingwei
    Lei, Lei
    [J]. ANNALS OF NUCLEAR ENERGY, 2019, 129 : 253 - 263
  • [9] Analysis and Optimization of Frequent Isolation of Steam Generator Blowdown System in CPR1000 Nuclear Power Plant
    Xu, Ying
    Xu, Jinquan
    Yang, Zongwei
    Yu, Hang
    [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2019, 40 (06): : 163 - 167