共 50 条
- [1] Optimization of Power Ramp Rate in CPR1000 Reactor Restarting [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2019, 40 (05): : 74 - 78
- [2] Transient analysis for CPR1000 reactor main pump and electromotor [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2013, 34 (03): : 152 - 155
- [3] A STUDY OF POWER DECREASE STRATEGY ON CPR1000 FULL SCOPE SIMULATOR [J]. PROCEEDINGS OF THE 25TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, 2017, VOL 1, 2017,
- [4] Analysis of Fluctuation Characteristics of Power Range Detector for CPR1000 [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2019, 40 (06): : 30 - 34
- [5] Implementation and Optimization Strategy of SG-CCTV Inspection of CPR1000 Nuclear Power Station [J]. 2020 6TH INTERNATIONAL CONFERENCE ON ENERGY, ENVIRONMENT AND MATERIALS SCIENCE, 2020, 585
- [6] A study of RCS depressurization strategy of CPR1000 SAMG [J]. KERNTECHNIK, 2022, 87 (03) : 251 - 259
- [7] Preliminary Study on Risk-informed LBLOCA of CPR1000 Nuclear Power Plant [J]. Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2018, 52 (06): : 1028 - 1033
- [9] Analysis and Optimization of Frequent Isolation of Steam Generator Blowdown System in CPR1000 Nuclear Power Plant [J]. Hedongli Gongcheng/Nuclear Power Engineering, 2019, 40 (06): : 163 - 167
- [10] Research on 90° elbow structure optimization for main coolant piping of CPR1000 nuclear power plant [J]. Li, Q.-B., 1600, Atomic Energy Press (34):