共 50 条
- [31] Correlation between subgrade settlement of high-speed railroad and train operation speed [J]. J Vib Shock, 2012, 10 (134-140):
- [32] Construction Technology for Pavement and Subgrade of Settlement Road and Bridge [J]. PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON CIVIL, TRANSPORTATION AND ENVIRONMENT, 2016, 78 : 186 - 189
- [33] Analytical solutions to ground settlement induced by ground loss and construction loadings during curved shield tunneling [J]. JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2021, 22 (04): : 296 - 313
- [34] Correlation Coefficient Control For Subgrade Settlement Curve Fitting [J]. PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON CIVIL, TRANSPORTATION AND ENVIRONMENT, 2016, 78 : 248 - 252
- [35] Safety testing and evaluation of construction quality of railway subgrade [J]. PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL 4, PTS A and B, 2004, 4 : 2172 - 2176
- [36] Analysis of Existing Railway's Subgrade Settlement Caused by Excavation Pit [J]. ADVANCES IN ENVIRONMENTAL VIBRATION, 2011, : 729 - 735
- [37] Research on deformation behavior of settlement of soft clay subgrade of Jiaoxin railway [J]. Beijing Jiaotong Daxue Xuebao, 2007, 4 (61-64):
- [39] EXPERIMENT OF HIGH-SPEED RAILWAY SUBGRADE SETTLEMENT PREDICTION ANALYSIS [J]. CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 453 - 458
- [40] New method for forecasting subgrade settlement of railway passenger dedicated line [J]. Yantu Lixue/Rock and Soil Mechanics, 2010, 31 (02): : 478 - 482