Improving accuracy of conceptual cost estimation using MRA and ANFIS in Indonesian building projects

被引:3
|
作者
Jumas, Dwifitra [1 ,2 ]
Mohd-Rahim, Faizul Azli [1 ]
Zainon, Nurshuhada [1 ]
Utama, Wayudi P. [2 ]
机构
[1] Univ Malaya, Quant Surveying, Fac Built Environm, Kuala Lumpur, Malaysia
[2] Univ Bung Hatta, Quant Surveying, Padang, Indonesia
关键词
Indonesia; Cost model; ANFIS; Multiple regression; Building project; Conceptual cost estimation;
D O I
10.1108/BEPAM-11-2017-0111
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Purpose The purpose of this paper is to develop a conceptual cost estimation (CCE) model for building project by using a pragmatic approach, which is a mix of tools drawn from multiple regression analysis (MRA) and adaptive neuro-fuzzy inference system (ANFIS), to improve the accuracy of cost estimation at an early stage. Design/methodology/approach This paper presents a set of MRA and integrating MRA with ANFIS or MRANFIS. A simultaneous regression analysis was developed to determine the main cost factors from 12 variables as input variables in the ANFIS model. Cost data from 78 projects of state building in West Sumatra, Indonesia were used to indicate the advantages of the proposed model. Findings The result shows that the proposed model, MRANFIS, has successfully improved the mean absolute percent error (MAPE) by 2.8 percent from MRA of 10.7-7.9 percent for closeness of fit to the model data and by 3.1 percent from MRA of 9.8-6.7 percent for prediction performance to the new data. Research limitations/implications Because the significant variables are different for each building type, the model may be not appropriate for other buildings depending on the characteristics of building. The models can be used and analyzed based on the own historical project data for each case so that the model can be applied. Originality/value The study thus provides better accuracy of CCE at an early stage for state building projects in West Sumatra, Indonesia by using the integrated model of MRA and ANFIS.
引用
下载
收藏
页码:348 / 357
页数:10
相关论文
共 50 条
  • [31] An Optimal Cost Estimation Practices of Fuzzy AHP for Building Construction Projects in Libya
    Alfaggi, Walid
    Naimi, Sepanta
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2022, 8 (06): : 1194 - 1204
  • [32] A simple formulation for early-stage cost estimation of building construction projects
    Dobrucali, Esra
    Demir, Ismail Hakki
    GRADEVINAR, 2021, 73 (08): : 819 - 832
  • [33] Improving the Accuracy of System Performance Estimation by Using Shards
    Ferro, Nicola
    Sanderson, Mark
    PROCEEDINGS OF THE 42ND INTERNATIONAL ACM SIGIR CONFERENCE ON RESEARCH AND DEVELOPMENT IN INFORMATION RETRIEVAL (SIGIR '19), 2019, : 805 - 814
  • [34] The accuracy of risk-based cost estimation for water infrastructure projects: preliminary evidence from Australian projects
    Liu, Li
    Napier, Zigrid
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2010, 28 (01) : 89 - 100
  • [35] d Investigatins the impact of using PMIS in resource management on cost of projects as a conceptual model in construction projects
    Mosavi, Seyed Karim
    Hosseini, Azim
    Vosoughifar, Hamid Reza
    Barandoust, Rambood
    Mohammadi, Ghodratollah
    NEXO REVISTA CIENTIFICA, 2022, 35 (02): : 601 - 610
  • [36] Cost Estimation Model Using Modified Parameters for Construction Projects
    Ji, Sae-Hyun
    Ahn, Joseph
    Lee, Hyun-Soo
    Han, Kyeongjin
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [37] Cost estimation methodology using database layer in construction projects
    Han, Kyeong Jin
    Lee, Hyun-Soo
    Park, Moonseo
    Ji, Sae-Hyun
    25TH INTERNATIONAL SYMPOSIUM ON AUTOMATION AND ROBOTICS IN CONSTRUCTION - ISARC-2008, 2008, : 470 - 475
  • [38] A novel conceptual cost estimation decision-making model for field canal improvement projects
    Elmousalami, Haytham H.
    Ali, Ali Hassan
    Kineber, Ahmed Farouk
    Elyamany, Ahmed
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (06) : 651 - 663
  • [39] The Influence of Solutions Adopted at the Stage of Planning the Building Investment on the Accuracy of Cost Estimation
    Dziadosz, Agnieszka
    2ND INTERNATIONAL CONFERENCE ON REHABILITATION AND MAINTENANCE IN CIVIL ENGINEERING (ICRMCE), 2013, 54 : 625 - 635
  • [40] Activity based risk assessment and safety cost estimation for residential building construction projects
    Gurcanli, G. Emre
    Bilir, Senem
    Sevim, Merve
    SAFETY SCIENCE, 2015, 80 : 1 - 12