Improving accuracy of conceptual cost estimation using MRA and ANFIS in Indonesian building projects

被引:3
|
作者
Jumas, Dwifitra [1 ,2 ]
Mohd-Rahim, Faizul Azli [1 ]
Zainon, Nurshuhada [1 ]
Utama, Wayudi P. [2 ]
机构
[1] Univ Malaya, Quant Surveying, Fac Built Environm, Kuala Lumpur, Malaysia
[2] Univ Bung Hatta, Quant Surveying, Padang, Indonesia
关键词
Indonesia; Cost model; ANFIS; Multiple regression; Building project; Conceptual cost estimation;
D O I
10.1108/BEPAM-11-2017-0111
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Purpose The purpose of this paper is to develop a conceptual cost estimation (CCE) model for building project by using a pragmatic approach, which is a mix of tools drawn from multiple regression analysis (MRA) and adaptive neuro-fuzzy inference system (ANFIS), to improve the accuracy of cost estimation at an early stage. Design/methodology/approach This paper presents a set of MRA and integrating MRA with ANFIS or MRANFIS. A simultaneous regression analysis was developed to determine the main cost factors from 12 variables as input variables in the ANFIS model. Cost data from 78 projects of state building in West Sumatra, Indonesia were used to indicate the advantages of the proposed model. Findings The result shows that the proposed model, MRANFIS, has successfully improved the mean absolute percent error (MAPE) by 2.8 percent from MRA of 10.7-7.9 percent for closeness of fit to the model data and by 3.1 percent from MRA of 9.8-6.7 percent for prediction performance to the new data. Research limitations/implications Because the significant variables are different for each building type, the model may be not appropriate for other buildings depending on the characteristics of building. The models can be used and analyzed based on the own historical project data for each case so that the model can be applied. Originality/value The study thus provides better accuracy of CCE at an early stage for state building projects in West Sumatra, Indonesia by using the integrated model of MRA and ANFIS.
引用
下载
收藏
页码:348 / 357
页数:10
相关论文
共 50 条
  • [41] BIM-based intelligent acquisition of construction information for cost estimation of building projects
    Ma, Zhiliang
    Liu, Zhe
    CREATIVE CONSTRUCTION CONFERENCE 2014, 2014, 85 : 358 - 367
  • [42] Improving accuracy and lowering cost in crowdsourcing through an unsupervised expertise estimation approach
    Moayedikia, Alireza
    Yeoh, William
    Ong, Kok-Leong
    Boo, Yee Ling
    DECISION SUPPORT SYSTEMS, 2019, 122
  • [43] Integrating Neurofuzzy System with Conceptual Cost Estimation to Discover Cost-Related Knowledge from Residential Construction Projects
    Yu, Wen-der
    Skibniewski, Miroslaw J.
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2010, 24 (01) : 35 - 44
  • [44] Increasing the accuracy of software development effort estimation using projects clustering
    Bardsiri, V. Khatibi
    Jawawi, D. N. A.
    Hashim, S. Z. M.
    Khatibi, E.
    IET SOFTWARE, 2012, 6 (06) : 461 - 473
  • [45] Improving accuracy of MAV pose estimation using Visual Odometry
    Ready, Bryce B.
    Taylor, Clark N.
    2007 AMERICAN CONTROL CONFERENCE, VOLS 1-13, 2007, : 5992 - 5997
  • [46] Improving the Accuracy of Ray Tracing Estimation Considering Inhomogeneous Building Surfaces in Urban Environments
    Lim, Jae-Woo
    Koh, Il-Suek
    Park, Youn-Hyun
    Moon, Hyun-Wook
    Jo, Han-Shin
    Yook, Jong-Gwan
    Yoon, Yong-Joong
    IEICE TRANSACTIONS ON COMMUNICATIONS, 2008, E91B (12) : 4067 - 4070
  • [47] Integrating an expert system with BrIMS, cost estimation, and linear scheduling at conceptual design stage of bridge projects
    Markiz, Nizar
    Jrade, Ahmad
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (05) : 913 - 928
  • [48] Improving the Prediction Accuracy of Building Energy Consumption using Location of Occupant
    Yang, Yu
    Jia, Qing-Shan
    Guan, Xiaohong
    PROCEEDINGS 2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL TECHNOLOGY (ICIT), 2016, : 1550 - 1555
  • [49] Cost Performance Estimation in Construction Projects Using Fuzzy Time Series
    Salari, Mostafa
    Yousefi, Nooshin
    Asgary, Mohhmad Mahdi
    INTERNATIONAL JOURNAL OF INFORMATION TECHNOLOGY PROJECT MANAGEMENT, 2015, 6 (01) : 66 - 75
  • [50] Improving Building Performance Using Smart Building Concept: Benefit Cost Ratio Comparison
    Berawi, Mohammed Ali
    Miraj, Perdana
    Sayuti, Mustika Sari
    Berawi, Abdur Rohim Boy
    3RD INTERNATIONAL CONFERENCE ON CONSTRUCTION AND BUILDING ENGINEERING (ICONBUILD 2017), 2017, 1903