Improving accuracy of conceptual cost estimation using MRA and ANFIS in Indonesian building projects

被引:3
|
作者
Jumas, Dwifitra [1 ,2 ]
Mohd-Rahim, Faizul Azli [1 ]
Zainon, Nurshuhada [1 ]
Utama, Wayudi P. [2 ]
机构
[1] Univ Malaya, Quant Surveying, Fac Built Environm, Kuala Lumpur, Malaysia
[2] Univ Bung Hatta, Quant Surveying, Padang, Indonesia
关键词
Indonesia; Cost model; ANFIS; Multiple regression; Building project; Conceptual cost estimation;
D O I
10.1108/BEPAM-11-2017-0111
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Purpose The purpose of this paper is to develop a conceptual cost estimation (CCE) model for building project by using a pragmatic approach, which is a mix of tools drawn from multiple regression analysis (MRA) and adaptive neuro-fuzzy inference system (ANFIS), to improve the accuracy of cost estimation at an early stage. Design/methodology/approach This paper presents a set of MRA and integrating MRA with ANFIS or MRANFIS. A simultaneous regression analysis was developed to determine the main cost factors from 12 variables as input variables in the ANFIS model. Cost data from 78 projects of state building in West Sumatra, Indonesia were used to indicate the advantages of the proposed model. Findings The result shows that the proposed model, MRANFIS, has successfully improved the mean absolute percent error (MAPE) by 2.8 percent from MRA of 10.7-7.9 percent for closeness of fit to the model data and by 3.1 percent from MRA of 9.8-6.7 percent for prediction performance to the new data. Research limitations/implications Because the significant variables are different for each building type, the model may be not appropriate for other buildings depending on the characteristics of building. The models can be used and analyzed based on the own historical project data for each case so that the model can be applied. Originality/value The study thus provides better accuracy of CCE at an early stage for state building projects in West Sumatra, Indonesia by using the integrated model of MRA and ANFIS.
引用
收藏
页码:348 / 357
页数:10
相关论文
共 50 条
  • [1] Conceptual cost estimation of building projects with regression analysis and neural networks
    Sonmez, R
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2004, 31 (04) : 677 - 683
  • [2] Cost estimation using ANFIS
    Lotfi, Ehsan
    Darini, M.
    Karimi-T, M. R.
    [J]. ENGINEERING ECONOMIST, 2016, 61 (02): : 144 - 154
  • [3] Improving the accuracy of approximate estimates of building projects
    [J]. Ling, Y.Y. (bdglyy@nus.edu.sg), 2001, Routledge (29):
  • [4] Improving the accuracy of approximate estimates of building projects
    Ling, YY
    Boo, JHS
    [J]. BUILDING RESEARCH AND INFORMATION, 2001, 29 (04): : 312 - 318
  • [5] Improving cost estimation in construction projects
    Sayed, Mohamed
    Abdel-Hamid, Mohamed
    El-Dash, Karim
    [J]. INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (01) : 135 - 143
  • [6] A hybrid conceptual cost estimating model for large building projects
    Kim, Hyung-Jin
    Seo, Yong-Chil
    Hyun, Chang-Taek
    [J]. AUTOMATION IN CONSTRUCTION, 2012, 25 : 72 - 81
  • [7] Reliabilty assessment of conceptual cost estimates for building construction projects
    An, Sung-Hoon
    Cho, Hunhee
    Lee, Ung-Kyun
    [J]. INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2011, 9 (01) : 9 - 16
  • [8] APPLICATION OF COST SIGNIFICANT ITEMS TOWARDS IMPROVING ESTIMATION FOR LIFE CYCLE COSTING OF BUILDING PROJECTS
    Alqahtani, Ayedh
    Whyte, Andrew
    [J]. IMPLEMENTING INNOVATIVE IDEAS IN STRUCTURAL ENGINEERING AND PROJECT MANAGEMENT, 2015, : A71 - A76
  • [9] Cost estimation model for building projects using case-based reasoning
    Ji, Sae-Hyun
    Park, Moonseo
    Lee, Hyun-Soo
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2011, 38 (05) : 570 - 581
  • [10] Using Machine Learning to Improve Cost and Duration Prediction Accuracy in Green Building Projects
    Darko, Amos
    Glushakova, Iuliia
    Boateng, Emmanuel B.
    Chan, Albert P. C.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (08)