共 50 条
- [1] AUTOMATIC OPERATION SYSTEM OF SINTER PLANT IN CHIBA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S798 - S798
- [3] INTEGRATED OPERATION SYSTEM OF COKEMAKING PROCESS AT CHIBA WORKS OF KAWASAKI-STEEL-CORP [J]. REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 1989, 86 (09): : 675 - 685
- [4] FURNACE COMPUTER CONTROL OF PLATE MILL AT CHIBA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S324 - S324
- [5] NEW CONTROL-SYSTEM OF THE SLAB CASTERS AT MIZUSHIMA-WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S264 - S264
- [6] CHARACTERISTICS AND OPERATION OF NO 6 PICKLING LINE AT CHIBA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1191 - 1191
- [7] SYNCHRONIZED PRODUCTION CONTROL-SYSTEM BETWEEN STEEL MAKING AND HOT-ROLLING AT MIZUSHIMA WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1988, 74 (07): : 1338 - 1345
- [8] THE CONSTRUCTION OF THE NEW REHEATING FURNACE FOR PLATE MILL IN CHIBA WORKS, KAWASAKI-STEEL-CORP .1. HIGH-PERFORMANCE CONTINUOUS REHEATING FURNACE IN CHIBA PLATE MILL, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1181 - 1181
- [9] ENERGY SAVING OPERATION IN SINTER PLANT OF CHIBA-WORKS, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S837 - S837
- [10] EFFECT OF COIL BOX INSTALLED INTO CHIBA NO 2 HOT STRIP MILL, KAWASAKI-STEEL-CORP [J]. TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S376 - S376