共 50 条
- [31] Algorithmic Approach for Overhauling of Modern Bulldozers thorough Management Techniques (PERT/CPM) AMA-AGRICULTURAL MECHANIZATION IN ASIA AFRICA AND LATIN AMERICA, 2011, 42 (04): : 33 - 36
- [32] ECONOMIC ENGINEERING STUDY REGARDING AEOLIAN INSTALLATION MANUFACTURING SYSTEM USING CPM AND PERT METHODS ANNALS OF DAAAM FOR 2008 & PROCEEDINGS OF THE 19TH INTERNATIONAL DAAAM SYMPOSIUM, 2008, : 1445 - 1446
- [34] Simplified CPM/PERT simulation model - Closure JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (06): : 515 - 515
- [36] A Study on Interval PERT/CPM Network Problems 11TH NATIONAL CONFERENCE ON MATHEMATICAL TECHNIQUES AND APPLICATIONS, 2019, 2112
- [37] Simplified CPM/PERT simulation model - Discussion JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (06): : 513 - 514
- [38] Overhaul maintenance of modern bulldozers with software-based management techniques (PERT/CPM) INDIAN JOURNAL OF AGRICULTURAL SCIENCES, 2015, 85 (04): : 493 - 497
- [40] LEVIN,RI - PLANNING AND CONTROL WITH PERT/CPM JOURNAL OF INDUSTRIAL ENGINEERING, 1967, 18 (12): : 725 - &