Overhaul maintenance of modern bulldozers with software-based management techniques (PERT/CPM)

被引:0
|
作者
Selvan, M. Muthamil [1 ]
Ahuja, Sangeeta [1 ]
Parray, Roaf Ahmad [1 ]
Rajaiah, P. [2 ]
Rangasamy, K. [1 ]
机构
[1] Indian Agr Res Inst, New Delhi 110012, India
[2] Indian Agr Res Inst, Div Agr Engn, New Delhi 110012, India
来源
关键词
Breakdown; Bulldozer; Overhauling; Programme evaluation and review technique; Software;
D O I
暂无
中图分类号
S [农业科学];
学科分类号
09 ;
摘要
Software programs on programme evaluation and review techniques (PERT) and critical path method (CPM) techniques have been developed to analyze the major overhauling of modern bulldozers. The knowledge of time and cost involved in a particular repair activity is essential to decide whether to continue the interrupted work and to assess whether or not it is possible to complete field operation within the stipulated time. These techniques identified forty two subsystems or activities. An analytical programme was subsequently worked out for the various operations related to major overhauling of bulldozer. The expected completion of all events required 192 hr with a variance of 8 hr. The analysis revealed that the probability of completing the overhauling ranged from 0.299 to 0.331 for completion duration of 185 to 200 hr respectively. The algorithms developed through software programs for major overhauling of bulldozer proved their superiority in the validation.
引用
收藏
页码:493 / 497
页数:5
相关论文
共 50 条
  • [1] Algorithmic Approach for Overhauling of Modern Bulldozers thorough Management Techniques (PERT/CPM)
    Selvan, M. Muthamil
    Durairaj, C. Divaker
    Rangasamy, K.
    Hemalatha, R.
    AMA-AGRICULTURAL MECHANIZATION IN ASIA AFRICA AND LATIN AMERICA, 2011, 42 (04): : 33 - 36
  • [2] NURSERY MANAGEMENT EMPLOYING CPM PERT TECHNIQUES
    CALKINS, J
    SWANSON, BT
    HORTSCIENCE, 1982, 17 (03) : 474 - 474
  • [3] PERT, AND HOW PERT TECHNIQUES CAN BE USED IN MODERN MINE MANAGEMENT
    BOOME, EJ
    SCHMIDT, AC
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1972, 73 (05): : 160 - 168
  • [4] PERT AND HOW PERT TECHNIQUES CAN BE USED IN MODERN MINE MANAGEMENT
    BOOME, ET
    SCHMIDT, AC
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 1973, 73 (06): : 205 - 206
  • [5] Modern Corneal Eye-Banking Using a Software-Based IT Management Solution
    Kern, C.
    Kortuem, K.
    Wertheimer, C.
    Nilmayer, O.
    Dirisamer, M.
    Priglinger, S.
    Mayer, W. J.
    JOURNAL OF OPHTHALMOLOGY, 2018, 2018
  • [6] Software-Based Management for Ethernet Networks
    Markus Hager
    Thomas Finke
    Jochen Seitz
    Thomas Waas
    Wireless Personal Communications, 2014, 74 : 1021 - 1032
  • [7] Software-Based Management for Ethernet Networks
    Hager, Markus
    Finke, Thomas
    Seitz, Jochen
    Waas, Thomas
    WIRELESS PERSONAL COMMUNICATIONS, 2014, 74 (03) : 1021 - 1032
  • [8] On the Accuracy of Software-Based Energy Estimation Techniques
    Hurni, Philipp
    Nyffenegger, Benjamin
    Braun, Torsten
    Hergenroeder, Anton
    WIRELESS SENSOR NETWORKS, 2011, 6567 : 49 - +
  • [9] Towards a Software-Based Approach to Smart Railway Maintenance
    Fernandes, Joao T.
    Curado, Marllia
    Boavida, Fernando
    2024 IEEE 22ND MEDITERRANEAN ELECTROTECHNICAL CONFERENCE, MELECON 2024, 2024, : 891 - 896
  • [10] Software-based information management in agricultural enterprises
    Doluschitz, R
    BERICHTE UBER LANDWIRTSCHAFT, 2001, 79 (04): : 529 - 551