APPLICATION OF PERT-CPM TO APPLIANCE MANUFACTURING MANAGEMENT

被引:0
|
作者
PATEL, PR [1 ]
机构
[1] MCGRAW EDISON CANADA LTD,TORONTO,ONTARIO,CANADA
关键词
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:B370 / B370
页数:1
相关论文
共 50 条
  • [21] PERT, CPM AND EXPORT PROCESS
    TATTERSON, JW
    WOOD, DF
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1974, 2 (03): : 421 - 426
  • [22] CPM, PERT and Project Management With Fuzzy Logic Technique and Implementation On A Business
    Mazlum, Mete
    Guneri, Ali Fuat
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON LEADERSHIP, TECHNOLOGY, INNOVATION AND BUSINESS MANAGEMENT (ICLTIBM-2014), 2015, 210 : 348 - 357
  • [23] Project management - Critical Path Method (CPM) and PERT simulated with processmodel
    Simmons, LF
    PROCEEDINGS OF THE 2002 WINTER SIMULATION CONFERENCE, VOLS 1 AND 2, 2002, : 1786 - 1788
  • [24] PROJECT MANAGEMENT OPTIMISTIC (GPO): A METHOD THAT INTEGRA PERT/CPM TO CCPM
    Novais, Igor Fontes
    de Freitas Jorge, Eduardo Manoel
    Costa Junior, Carlos Pereira
    Souza, Daniele Tavares
    REVISTA DE GESTAO E PROJETOS, 2011, 2 (02): : 150 - 165
  • [25] CPM/PERT的简化方法
    刘方强
    章海阳
    陈远祥
    基建优化, 2001, (03) : 22 - 23
  • [26] Simplified CPM/PERT simulation model
    Lu, M
    AbouRizk, SM
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (03): : 219 - 226
  • [27] DEVELOPMENTS IN CPM, PERT, AND NETWORK ANALYSIS
    POPESCU, C
    BORCHERDING, JD
    JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1975, 101 (04): : 769 - 784
  • [28] BASIC REVIEW OF PERT/CPM TECHNOLOGY
    SELF, G
    OPERATIONS RESEARCH, 1965, S 13 : B154 - &
  • [29] DEVELOPMENTS IN CPM, PERT, AND NETWORK ANALYSIS
    Popescu, Calin
    Borcherding, John D.
    American Society of Civil Engineers, Journal of the Construction Division, 1975, 101 (04): : 769 - 784
  • [30] NETWORK ANALYSIS TECHNIQUES (CPM, PERT)
    ZELENY, M
    EKONOMICKO-MATEMATICKY OBZOR, 1965, 65 (03): : 225 - 262