Design and construction of the Metrolink Finback Bridge

被引:4
|
作者
Jones, Stephen W. [1 ]
Wrigley, Bob G. [2 ]
机构
[1] Gifford, Chester, Cheshire, England
[2] Gifford, Southampton, Hants, England
关键词
bridges; concrete structures; stress analysis;
D O I
10.1680/bren.2007.160.2.71
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Manchester to Oldham line of the proposed Metrolink Phase 3 passes through the new Central Park business park utilising the existing track bed of a disused and dismantled heavy rail route. To the east of Thorp Road Bridge the new Metrolink route crosses the existing four tracks of the Manchester to Leeds Trans-Pennine railway. A post-tensioned concrete finback bridge has been provided to carry the new twin Metrolink tracks over the existing heavy rail route. In order to minimise disruption to the operational railway, the Finback Bridge was constructed in a position alongside and roughly parallel to the existing railway. Once the construction was substantially complete, the 6250 t bridge was rotated in plan through 218 to its final position during a weekend possession. The site constraints resulted in a reversecurved horizontal alignment with the consequential requirement to cater for significant torsion in the design of the deck. The deck solution was a box section finback bridge with varying fin height and fin wall thickness. The bottom slab of the box was extended to cantilever outside the central fin to support the Metrolink tracks. The superstructure incorporates two types of post-tensioning; internal bonded tendons in the deck slab of the main span and external unbonded tendons located inside the fin.
引用
收藏
页码:71 / 79
页数:9
相关论文
共 50 条
  • [41] Design and Construction of the Main Bridge of the Yangmeizhou Bridge in Xiangtan, China
    Xu, Ziran
    Wang, Tian
    Peng, Jianghui
    Pi, Fuyan
    STRUCTURAL ENGINEERING INTERNATIONAL, 2025,
  • [42] DESIGN AND CONSTRUCTION OF THE DORNOCH-FIRTH BRIDGE - DESIGN
    IVERSEN, N
    FAULDS, JR
    ROWLEY, FN
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-TRANSPORT, 1993, 100 (03) : 133 - 144
  • [43] ST-LOUIS-METROLINK, CHANGING THE RULES OF TRANSIT DESIGN
    ADAMS, A
    PLACES-A QUARTERLY JOURNAL OF ENVIRONMENTAL DESIGN, 1994, 9 (02): : 88 - 90
  • [44] Design and Construction of Mersey Gateway Bridge, UK
    Sanders, Paul
    Brennan, Gerard
    Wood, Hugo
    Banks, John
    Romo Martin, Jose
    STRUCTURES CONGRESS 2019: BRIDGES, NONBUILDING AND SPECIAL STRUCTURES, AND NONSTRUCTURAL COMPONENTS, 2019, : 186 - 197
  • [45] Design and construction of Third Karnaphuli Bridge, Bangladesh
    Astin, D.
    Xie, H.
    Gillarduzzi, A.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2010, 163 (04) : 161 - 171
  • [46] Penang Bridge widening: design and construction challenges
    Corbett, P. W.
    Buckby, R. J.
    Wee, E. L.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2010, 163 (03) : 125 - 135
  • [47] Fiber Reinforced Polymers in bridge design and construction
    Seible, F
    HIGH PERFORMANCE MATERIALS IN BRIDGES, 2003, : 227 - 237
  • [48] PCA bridge awards for excellence in design and construction
    Anon
    Indian Concrete Journal, 2001, 75 (04): : 255 - 259
  • [49] DESIGN AND CONSTRUCTION OF THE EAST HUNTINGTON BRIDGE.
    Grant, Arvid
    PCI Journal, 1987, 32 (01): : 20 - 29
  • [50] Design and construction of a launched steel girder bridge
    Ahmadi-Kashani, Kamran
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2015, 168 (04) : 299 - 307