Design and construction of the Metrolink Finback Bridge

被引:4
|
作者
Jones, Stephen W. [1 ]
Wrigley, Bob G. [2 ]
机构
[1] Gifford, Chester, Cheshire, England
[2] Gifford, Southampton, Hants, England
关键词
bridges; concrete structures; stress analysis;
D O I
10.1680/bren.2007.160.2.71
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Manchester to Oldham line of the proposed Metrolink Phase 3 passes through the new Central Park business park utilising the existing track bed of a disused and dismantled heavy rail route. To the east of Thorp Road Bridge the new Metrolink route crosses the existing four tracks of the Manchester to Leeds Trans-Pennine railway. A post-tensioned concrete finback bridge has been provided to carry the new twin Metrolink tracks over the existing heavy rail route. In order to minimise disruption to the operational railway, the Finback Bridge was constructed in a position alongside and roughly parallel to the existing railway. Once the construction was substantially complete, the 6250 t bridge was rotated in plan through 218 to its final position during a weekend possession. The site constraints resulted in a reversecurved horizontal alignment with the consequential requirement to cater for significant torsion in the design of the deck. The deck solution was a box section finback bridge with varying fin height and fin wall thickness. The bottom slab of the box was extended to cantilever outside the central fin to support the Metrolink tracks. The superstructure incorporates two types of post-tensioning; internal bonded tendons in the deck slab of the main span and external unbonded tendons located inside the fin.
引用
收藏
页码:71 / 79
页数:9
相关论文
共 50 条
  • [31] Design and construction of open deck bridge
    Abo, T.
    Ooba, M.
    Yoda, S.
    Suzuki, S.
    TAILOR MADE CONCRETE STRUCTURES: NEW SOLUTIONS FOR OUR SOCIETY, 2008, : 162 - 162
  • [32] Design and Construction of the Auenbach Bridge, Austria
    Geier, Roman
    STRUCTURAL ENGINEERING INTERNATIONAL, 2010, 20 (02) : 153 - 156
  • [33] Peace Bridge, Londonderry: design and construction
    Brown, Philip
    Kuhendran, Kandiah
    Marks, James
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2015, 168 (02) : 163 - 172
  • [34] Design and construction of Sutong Bridge tower
    Luo Chengbin1
    2.Jiangsu Provincial Sutong Bridge Construction Commanding Department
    3.Key Lab of Bridge &Tunnel Technology of CCCG&WHEDRI
    4.Communications Planning and Design Institute of Jiangsu Province
    Engineering Sciences, 2009, 7 (01) : 45 - 51
  • [35] Design and construction of a Honduran replacement bridge
    Li, Zhenqiang
    Ramirez, Rigoberto
    Carlos Argueello, Juan
    PCI JOURNAL, 2006, 51 (04): : 70 - +
  • [36] Concrete bridge design and construction series
    Structural Engineer, 2014, 92 (02): : 28 - 32
  • [37] DESIGN AND CONSTRUCTION OF USAGAWA BRIDGE.
    Uchida, Michio
    Civil engineering in Japan, 1982, 21 : 155 - 166
  • [38] YAMATOGAWA BRIDGE: DESIGN AND CONSTRUCTION.
    Taido, Yoneyoshi
    Civil engineering in Japan, 1983, 22 : 68 - 79
  • [39] DISCUSSION - THE DESIGN AND CONSTRUCTION OF FRIARTON BRIDGE
    KERENSKY, OA
    ROBINSON, J
    SMITH, BL
    STRUCTURAL ENGINEER-PART A, 1982, 60 (06): : 189 - 196
  • [40] Design, construction and testing of the Sanshui Bridge
    Ma, W
    Han, DJ
    STRUCTURES IN THE NEW MILLENNIUM, 1997, : 439 - 444