Design and construction of the Metrolink Finback Bridge

被引:4
|
作者
Jones, Stephen W. [1 ]
Wrigley, Bob G. [2 ]
机构
[1] Gifford, Chester, Cheshire, England
[2] Gifford, Southampton, Hants, England
关键词
bridges; concrete structures; stress analysis;
D O I
10.1680/bren.2007.160.2.71
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Manchester to Oldham line of the proposed Metrolink Phase 3 passes through the new Central Park business park utilising the existing track bed of a disused and dismantled heavy rail route. To the east of Thorp Road Bridge the new Metrolink route crosses the existing four tracks of the Manchester to Leeds Trans-Pennine railway. A post-tensioned concrete finback bridge has been provided to carry the new twin Metrolink tracks over the existing heavy rail route. In order to minimise disruption to the operational railway, the Finback Bridge was constructed in a position alongside and roughly parallel to the existing railway. Once the construction was substantially complete, the 6250 t bridge was rotated in plan through 218 to its final position during a weekend possession. The site constraints resulted in a reversecurved horizontal alignment with the consequential requirement to cater for significant torsion in the design of the deck. The deck solution was a box section finback bridge with varying fin height and fin wall thickness. The bottom slab of the box was extended to cantilever outside the central fin to support the Metrolink tracks. The superstructure incorporates two types of post-tensioning; internal bonded tendons in the deck slab of the main span and external unbonded tendons located inside the fin.
引用
收藏
页码:71 / 79
页数:9
相关论文
共 50 条
  • [22] New Maslenica Bridge - design and construction
    Candrlic, Vinko
    Radic, Jure
    Savor, Zlatko
    Friedl, Marsel
    Skomrlj, Mladen
    Zderic, Zeljko
    Gradevinar, 1995, 47 (09):
  • [23] Design & construction of the CSX Ninemile Bridge
    Chapin, SJ
    Plott, HW
    Edmonds, FC
    14TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION - PROCEEDINGS, 1997, : 388 - 393
  • [24] Casco Bay Bridge - Design and construction
    Eppehimer, RJ
    Huang, LK
    15TH ANNUAL INTERNATIONAL BRIDGE CONFERENCE AND EXHIBITION, 1998, : 477 - 484
  • [25] ORWELL BRIDGE - DESIGN AND CONSTRUCTION - DISCUSSION
    LEWIS, CD
    DUNTON, GW
    MAY, RWP
    TIPLADY
    PREESE
    HALLS, PN
    ROWLEY, FN
    WEX, BP
    WEIR, KL
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1985, 78 (APR): : 449 - 459
  • [26] KYLESKU BRIDGE - DESIGN AND CONSTRUCTION.
    Stears, H.S.
    Highways and transportation, 1985, 32 (01): : 16 - 20
  • [27] Design and construction of the Hålogaland Bridge
    Pihl, Jesper
    ce/papers, 2019, 3 (3-4) : 103 - 108
  • [28] DESIGN AND CONSTRUCTION OF KESSOCK BRIDGE - DISCUSSION
    KNOX, HCG
    DEASON, PM
    HOMBERG, H
    WALLACE, AAC
    NISSEN, J
    WALSHE, DE
    KRETSIS, K
    TIPLADY, G
    FREEMAN, RA
    STRACHAN, CD
    SANDBERG, ACE
    NASH, GFJ
    PRITCHARD, BP
    CASS, PD
    STEWART, D
    EVANS, JE
    GEE, AF
    HAMBLY, EC
    FLETCHER, MS
    CHATTERJEE, S
    FIRTH, IPT
    HUBAND, MV
    ECCLESTON, BC
    TINDALL, PB
    BROWN, CW
    CLEMENTS, L
    BOOTH, CW
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1986, 80 : 179 - 214
  • [29] DESIGN AND CONSTRUCTION OF THE EAST HUNTINGTON BRIDGE
    GRANT, A
    JOURNAL PRESTRESSED CONCRETE INSTITUTE, 1987, 32 (01): : 20 - 29
  • [30] DESIGN AND CONSTRUCTION OF FRIARTON BRIDGE.
    Kerensky, D.A.
    Robinson, John
    Smith, Brian L.
    Structural Engineer, 1980, 58 A (12): : 395 - 404