共 50 条
- [4] BOT CONTRACTS FOR WATER-SUPPLY [J]. WORLD WATER 89: MANAGING THE FUTURE - LEARNING FROM THE PAST, 1989, : 215 - 220
- [5] Estimation of minimum working capital for construction projects in Malaysia [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2003, 129 (04): : 369 - 374
- [7] Shadow tolling model of expressway BOT projects [J]. PROCEEDINGS OF 20TH IPMA WORLD CONGRESS ON PROJECT MANAGEMENT, VOLS 1 AND 2, 2006, : 101 - 105
- [8] A grey evaluation model on bidders for BOT projects [J]. Proceedings of 2005 International Conference on Machine Learning and Cybernetics, Vols 1-9, 2005, : 3433 - 3437
- [9] A LEGAL ANALYSIS OF SUCCESSFUL AND PROBLEMATIC BUILD OPERATE AND TRANSFER (BOT) PROJECTS IN MALAYSIA [J]. INTERNATIONAL JOURNAL OF BUSINESS AND SOCIETY, 2012, 13 (02): : 133 - 150
- [10] Unraveling of BOT scheme: Malaysia's Indah Water Konsortium [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (06): : 457 - 460