共 50 条
- [1] A rough sets based evaluation model for bot projects bidders [J]. ARTIFICIAL INTELLIGENCE APPLICATIONS AND INNOVATIONS II, 2005, 187 : 545 - 555
- [3] Research on the Indicator System and Risk Evaluation Model of the BOT Projects Bidding Program [J]. 2008 IEEE INTERNATIONAL SYMPOSIUM ON KNOWLEDGE ACQUISITION AND MODELING WORKSHOP PROCEEDINGS, VOLS 1 AND 2, 2008, : 1002 - 1005
- [4] Research on the Indicator System and Risk Evaluation Model of the BOT Projects Bidding Program [J]. 2008 IEEE INTERNATIONAL SYMPOSIUM ON KNOWLEDGE ACQUISITION AND MODELING WORKSHOP PROCEEDINGS, VOLS 1 AND 2, 2008, : 414 - 417
- [5] Shadow tolling model of expressway BOT projects [J]. PROCEEDINGS OF 20TH IPMA WORLD CONGRESS ON PROJECT MANAGEMENT, VOLS 1 AND 2, 2006, : 101 - 105
- [6] Research on the risk evaluation model of BOT projects bidding program based on fuzzy Mathematics [J]. PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 404 - 407
- [7] Study on the Model of Integrated Risk Management for BOT Projects [J]. ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 3374 - 3377
- [8] CSFs in competitive tendering and negotiation model for BOT projects [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (03): : 205 - 211
- [9] Risk Evaluation Model on Bidding Scheme for BOT Projects Based on Fuzzy Theory and Information Entropy [J]. PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 139 - 142
- [10] Evaluation and management of political risks in China's bot projects [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (03): : 242 - 250