A grey evaluation model on bidders for BOT projects

被引:0
|
作者
Yu, YH [1 ]
Shan, MY [1 ]
机构
[1] Hunan Univ, Sch Management, Changsha 410082, Peoples R China
关键词
evaluation model; grey theory; bidding; BOT project;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Bidding is regarded as an efficient method for procuring goods and services. An accurate evaluation on bidders is the key point of a successful bidding. However, evaluation on bidders is a tough and comprehensive work and the result of the evaluation is always affected by evaluators' understanding on standards set for evaluation, evaluators' expertise, experience and preference. This paper aims to find a better method to make evaluation on selecting bidders accurate as much as possible. Toward this purpose, a grey evaluation model on bidder is presented and an instance of bidding for BOT project is illustrated in details to make the practitioners know how to use the model.
引用
收藏
页码:3433 / 3437
页数:5
相关论文
共 50 条
  • [31] A Royalty Negotiation Model for BOT Projects: A Bi-level Programming Approach
    Kang, Chao-Chung
    Feng, Cheng-Min
    Kuo, Chiu-Yen
    [J]. IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 1764 - +
  • [32] Concession decision model of BOT projects basedon bi-level programming
    Yang, Weihua
    Dai, Dashuang
    [J]. Fifth Wuhan International Conference on E-Business, Vols 1-3: INTEGRATION AND INNOVATION THROUGH MEASUREMENT AND MANAGEMENT, 2006, : 2500 - 2504
  • [33] The impact of foreign currency on BOT projects
    Chandra, F
    Chang, LM
    [J]. CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 878 - 888
  • [34] BOT financing in public infrastructure projects
    Mao, CK
    Chang, LM
    [J]. CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 868 - 877
  • [35] Contract conditions of BOT projects in China
    Li Jie
    Zou, P. X. W.
    Cheng Hu
    Dai Zhaohua
    [J]. PROCEEDINGS OF CRIOCM 2007 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2007, : 966 - 979
  • [36] A CONTINUOUS-TIME NPV MODEL FOR DETERMINING THE CONCESSION PERIOD OF BOT PROJECTS
    Xu, Jiang-wei
    Moon, Sungwoo
    [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 235 - 239
  • [37] Controlling Vehicle Overloading in BOT Projects
    Bagui, Swapan
    Das, Atasi
    Bapanapalli, Chiranjeevi
    [J]. 2ND CONFERENCE OF TRANSPORTATION RESEARCH GROUP OF INDIA (2ND CTRG), 2013, 104 : 962 - 971
  • [38] MODEL FORM OF INSTRUCTIONS TO BIDDERS
    不详
    [J]. JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1974, 100 (NCO1): : 27 - 31
  • [39] Evaluation and Optimization of Research Projects Based on Grey Relational Analysis Method
    Li, Mu
    Wang, Jiajie
    Wang, Jingyi
    [J]. MECHANICAL ENGINEERING AND GREEN MANUFACTURING II, PTS 1 AND 2, 2012, 155-156 : 1045 - 1049
  • [40] MODEL FORM OF NOTICE TO BIDDERS
    不详
    [J]. JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1974, 100 (NCO3): : 373 - 375