共 50 条
- [31] A Royalty Negotiation Model for BOT Projects: A Bi-level Programming Approach [J]. IEEM: 2008 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-3, 2008, : 1764 - +
- [32] Concession decision model of BOT projects basedon bi-level programming [J]. Fifth Wuhan International Conference on E-Business, Vols 1-3: INTEGRATION AND INNOVATION THROUGH MEASUREMENT AND MANAGEMENT, 2006, : 2500 - 2504
- [33] The impact of foreign currency on BOT projects [J]. CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 878 - 888
- [34] BOT financing in public infrastructure projects [J]. CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 868 - 877
- [35] Contract conditions of BOT projects in China [J]. PROCEEDINGS OF CRIOCM 2007 INTERNATIONAL RESEARCH SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, VOLS 1 AND 2, 2007, : 966 - 979
- [36] A CONTINUOUS-TIME NPV MODEL FOR DETERMINING THE CONCESSION PERIOD OF BOT PROJECTS [J]. PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 235 - 239
- [37] Controlling Vehicle Overloading in BOT Projects [J]. 2ND CONFERENCE OF TRANSPORTATION RESEARCH GROUP OF INDIA (2ND CTRG), 2013, 104 : 962 - 971
- [38] MODEL FORM OF INSTRUCTIONS TO BIDDERS [J]. JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1974, 100 (NCO1): : 27 - 31
- [39] Evaluation and Optimization of Research Projects Based on Grey Relational Analysis Method [J]. MECHANICAL ENGINEERING AND GREEN MANUFACTURING II, PTS 1 AND 2, 2012, 155-156 : 1045 - 1049
- [40] MODEL FORM OF NOTICE TO BIDDERS [J]. JOURNAL OF THE CONSTRUCTION DIVISION-ASCE, 1974, 100 (NCO3): : 373 - 375